A theory of resource sharing in a mixed system with hard real-time and non-real-time processing requirements is presented. The real-time processing is modeled as rate-based execution (RBE) tasks whose resource needs are known in advance. The non-real-time processing is modeled as aperiodic requests and dynamically mapped to weight-based variable rate execution tasks. The resource sharing requirements of the aperiodic requests are unknown a priori and only become known when a critical section is reached. A scheduling algorithm that supports resource sharing without deadlock in such a mixed system is presented with a sufficient off-line schedulability condition.
منابع مشابه
Resource leveling scheduling by an ant colony-based model
In project scheduling, many problems can arise when resource fluctuations are beyond acceptable limits. To overcome this, mathematical techniques have been developed for leveling resources. However, these produce a hard and inflexible approach in scheduling projects. The authors propose a simple resource leveling approach that can be used in scheduling projects with multi-mode execution activit...
متن کاملAn integrated simulation-DEA approach to multi-criteria ranking of scenarios for execution of operations in a construction project
The purpose of this study is to examine different scenarios for implementing operations in the pre-construction phase of a project, based on several competing criteria with different importance levels in order to achieve a more efficient execution plan. This paper presents a new framework that integrates discrete event simulation (DES) and data envelopment analysis (DEA) to rank different scena...
متن کاملStability Assessment Metamorphic Approach (SAMA) for Effective Scheduling based on Fault Tolerance in Computational Grid
Grid Computing allows coordinated and controlled resource sharing and problem solving in multi-institutional, dynamic virtual organizations. Moreover, fault tolerance and task scheduling is an important issue for large scale computational grid because of its unreliable nature of grid resources. Commonly exploited techniques to realize fault tolerance is periodic Checkpointing that periodically ...
متن کاملA Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
متن کاملA New Bi-Objective Model for a Multi-Mode Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and four Payment Models
The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...