Research on Reliability and Cost Integrated Optimization Algorithm of Construction Project Logistics System
نویسندگان
چکیده
The structure of the construction project logistics system is decomposed in detail; some uncertain factors affecting system reliability are analyzed. This paper applies the probabilityinfluence coordinate graph to screen out the logistics subsystem that has great influence on system reliability under the conditions of occurring failure, and establishes an allocation model of the reliability index in construction project logistics system based on the restriction of cost, makes use of the presented model and algorithm to calculate the cost-based reliability, contrasts it with the index reliability assigned by the scoring method to the optimal distribution value of reliability index and the optimal cost. The presented detailed methods and steps can offer the meaningful reference for reliability optimization management of the logistics system in the construction project.
منابع مشابه
FORM FINDING FOR RECTILINEAR ORTHOGONAL BUILDINGS THROUGH CHARGED SYSTEM SEARCH ALGORITHM
Preliminary layout design of buildings has a substantial effect on the ultimate design of structural components and accordingly influences the construction cost. Exploring structurally efficient forms and shapes during the conceptual design stage of a project can also facilitate the optimum integrated design of buildings. This paper presents an automated method of determining column layout desi...
متن کاملMulti-objective optimization of time-cost-quality-carbon dioxide emission-plan robustness in construction projects
Today, the construction industry is facing intense competition and success in this competition depends on several factors. Project managers try to minimize project time and cost, carbon dioxide emission and at the same time maximizing the quality of project and its plan robustness. In this paper, study construction project scheduling considering a discrete trade-off between time, cost, quality,...
متن کاملAn Ant Colony approach to forward-reverse logistics network design under demand certainty
Forward-reverse logistics network has remained a subject of intensive research over the past few years. It is of significant importance to be issued in a supply chain because it affects responsiveness of supply chains. In real world, problems are needed to be formulated. These problems usually involve objectives such as cost, quality, and customers' responsiveness and so on. To this reason, we ...
متن کاملMULTI-OBJECTIVE OPTIMIZATION OF TIME-COST-SAFETY USING GENETIC ALGORITHM
Safety risk management has a considerable effect on disproportionate injury rate of construction industry, project cost and both labor and public morale. On the other hand time-cost optimization (TCO) may earn a big profit for project stakeholders. This paper has addressed these issues to present a multi-objective optimization model to simultaneously optimize total time, total cost and overall ...
متن کاملA Benders Decomposition Method to Solve an Integrated Logistics Network Designing Problem with Multiple Capacities
In this paper, a new model is proposed for the integrated logistics network designing problem. In many research papers in this area, it is assumed that there is only one option for the capacity of each facility in the network. However, this is not a realistic assumption because generally there may be many possible options for the capacity of the facility that is being established. Usually the c...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2013