Direct solution to constrained tropical optimization problems with application to project scheduling

نویسنده

  • Nikolai Krivulin
چکیده

We examine a new optimization problem formulated in the tropical mathematics setting as a further extension of certain known problems. The problem is to minimize a nonlinear objective function, which is defined on vectors over an idempotent semifield by using multiplicative conjugate transposition, subject to inequality constraints. As compared to the known problems, the new one has a more general objective function and additional constraints. We provide a complete solution in an explicit form to the problem by using an approach that introduces an auxiliary variable to represent the values of the objective function, and then reduces the initial problem to a parametrized vector inequality. The minimum of the objective function is evaluated by applying the existence conditions for the solution of this inequality. A complete solution to the problem is given by solving the parametrized inequality, provided the parameter is set to the minimum value. As a consequence, we obtain solutions to new special cases of the general problem. To illustrate the application of the results, we solve a real-world problem drawn from time-constrained project scheduling, and offer a representative numerical example. Key-Words: tropical mathematics, idempotent semifield, constrained optimization, complete solution, time-constrained project scheduling. MSC (2010): 65K10, 15A80, 65K05, 90C48, 90B35

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project

This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...

متن کامل

The preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach

Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

متن کامل

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

Detecting communities of workforces for the multi-skill resource-constrained project scheduling problem: A dandelion solution approach

This paper proposes a new mixed-integer model for the multi-skill resource-constrained project scheduling problem (MSRCPSP). The interactions between workers are represented as undirected networks. Therefore, for each required skill, an undirected network is formed which shows the relations of human resources. In this paper, community detection in networks is used to find the most compatible wo...

متن کامل

Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)

Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Comput. Manag. Science

دوره 14  شماره 

صفحات  -

تاریخ انتشار 2017