Production Rate Determination for Linear Construction Projects Based on Linear Scheduling Method

نویسندگان

  • Liqiang Liu
  • Yisheng Liu
  • Yuanjie Tang
چکیده

Traditional scheduling methods such as CPM or PERT have been found to be inappropriate for scheduling the linear construction projects. According to the limitations of Traditional scheduling methods, Linear Scheduling Method (LSM) is proposed specifically for linear construction projects. Aiming at overcoming the limitations of network technology in deciding the production rate of linear construction projects, basing on LSM with its mathematical principle, this paper proposes a new method to decide the production rate of linear construction projects. This paper first analyses the parameters of linear scheduling method and their interrelationships, such as distance interval, time interval, activity, CAP determination of LSM. Then it gives determination method of production rate and the rate float. The determination method can increase the effectiveness of production rate input and output data for the linear projects, which will significantly improve the resource allocation. It also draws the effect of production rate float in the construction schedule control.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY

Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...

متن کامل

TBM Tunneling Construction Time with Respect to Learning Phase Period and Normal Phase Period

In every tunnel boring machine (TBM) tunneling project, there is an initial low production phase so-called the Learning Phase Period (LPP), in which low utilization is experienced and the operational parameters are adjusted to match the working conditions. LPP can be crucial in scheduling and evaluating the final project time and cost, especially for short tunnels for which it may constitute a ...

متن کامل

OPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING

During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentraliz...

متن کامل

Current State of Highway Projects Planning and Scheduling

Highway projects involve huge capital investments and prolonged durations. A number of researchers have developed various computer-based tools and techniques to help planners prepare plans and schedules based on their specific needs. CPM is the predominant scheduling method used in construction industry. However, its inability to efficiently plan and schedule repetitive projects such as highway...

متن کامل

Time Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry

This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time horizons. Being trained by a locally linear model tree (LOLIMOT) learning algorithm, the model is int...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016