Fast and effective algorithms for the liquid crystal display module (LCM) scheduling problem with sequence-dependent setup time
نویسندگان
چکیده
The liquid crystal display module scheduling problem (LCMSP) is a variation of the classical parallel machines scheduling problem, which has many real-world applications, particular, in the thin film transistor liquid crystal display (TFT-LCD) manufacturing industry. In this paper, we present a case study on the LCMSP, which is taken from a final liquid crystal display module (LCM) shop floor in a TFT-LCD industry. For the case we investigated, the jobs are clustered by their product types and the machine setup time is sequentially dependent on the product types of the jobs processed on the machine. In LCMSP, the objective is to maximize the total profit subject to fulfilling contracted quantities without violating the due date and machine capacity restrictions. The LCMSP can be modelled as a multi-level optimization problem. The sub-problem of LCMSP can be transformed into the vehicle routing problem with time window (VRPTW). One can therefore solve the LCMSP efficiently using existing VRPTW algorithms. We present two new algorithms based on the savings algorithms with some modifications to accommodate the LCMSP. Based on the characteristics of the LCM process, a set of test problems is generated covering most of the real-world applications for test purposes. Computational results and performance comparisons show that the proposed algorithms solved the LCMSP efficiently and near-optimally. Journal of the Operational Research Society (2009) 60, 921–933. doi:10.1057/palgrave.jors.2602604 Published online 4 June 2008
منابع مشابه
A comparison of algorithms for minimizing the sum of earliness and tardiness in hybrid flow-shop scheduling problem with unrelated parallel machines and sequence-dependent setup times
In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...
متن کاملSolving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times
Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...
متن کاملTwo meta-heuristic algorithms for parallel machines scheduling problem with past-sequence-dependent setup times and effects of deterioration and learning
This paper considers identical parallel machines scheduling problem with past-sequence-dependent setup times, deteriorating jobs and learning effects, in which the actual processing time of a job on each machine is given as a function of the processing times of the jobs already processed and its scheduled position on the corresponding machine. In addition, the setup time of a job on each machin...
متن کاملSolving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times
Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...
متن کاملA fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates
This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- JORS
دوره 60 شماره
صفحات -
تاریخ انتشار 2009