Risk assessment for build-operate-transfer projects: a dynamic multi-objective programming approach

نویسندگان

  • Chao-Chung Kang
  • Cheng-Min Feng
  • Haider A. Khan
چکیده

This study uses a dynamic multi-objective programming approach to establish a risk assessment model, and develops an iterative algorithm for the model solution. The results obtained show that the sum of the interactive utility value could determine whether or not the interactive relationship is characterized by independence among negotiators. In addition, our numerical example shows that the risk measurement model developed can re4ect risk assessment made by the negotiation group for certain events, and can analyze interaction characteristics among negotiators. ? 2003 Elsevier Ltd. All rights reserved.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Determination of Concession Period in Build-Operate-Transfer Projects Using Fuzzy Logic

The build-operate-transfer (BOT) projects are a popular method of privatization of public infrastructure development. There are several risks which might affect a BOT project negatively. Concession period is one of the most important decision variables in arranging a BOT-type contract which should be determined considering the existing risks and uncertainties. A longer concession period is more...

متن کامل

A Multi-Objective Fuzzy Approach to Closed-Loop Supply Chain Network Design with Regard to Dynamic Pricing

During the last decade, reverse logistics networks received a considerable attention due to economic importance and environmental regulations and customer awareness. Integration of leading and reverse logistics networks during logistical network design is one of the most important factors in supply chain. In this research, an Integer Linear Programming model is presented to design a multi-layer...

متن کامل

A Multi-Criteria Decision-Making Approach with Interval Numbers for Evaluating Project Risk Responses

The risk response development is one of the main phases in the project risk management that has major impacts on a large-scale project’s success. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. Conventional approaches tend to be less effective in dealing with the imprecise of the risk response deve...

متن کامل

Designing a Multi-Objective Mathematical Model Using Intuitionistic Fuzzy Approach to Select Investment Projects (Case of Investment Opportunities in Bushehr Province)

Strategic development goals is achieved by investment potential utilization of each region. Some of these goals may be inconsistent. Therefore, Governments want to align a combination of different investment objectives and sometimes contradictory as far as possible. This study aimed to explain the mathematical model for investment projects by providing an integer linear programming model with t...

متن کامل

Measuring a Dynamic Efficiency Based on MONLP Model under DEA Control

Data envelopment analysis (DEA) is a common technique in measuring the relative efficiency of a set of decision making units (DMUs) with multiple inputs and multiple outputs. ‎‎Standard DEA models are ‎‎quite limited models‎, ‎in the sense that they do not consider a DMU ‎‎at different times‎. ‎To resolve this problem‎, ‎DEA models with dynamic ‎‎structures have been proposed‎.‎In a recent pape...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Computers & OR

دوره 32  شماره 

صفحات  -

تاریخ انتشار 2005