MODEL BASED CONSTRUCTION PROCESS MANAGEMENT Model based construction process management

نویسنده

  • J. LAITINEN
چکیده

The purpose of this research was to study how the data management of a main contractor can be improved, in order to provide better client value and more costefficient production. The research focused on methods for reengineering the information management using product modelling as an enabling technology. The methods were tested in pilot tests in which the developed cost and value engineering prototype application was used. This paper demonstrates an integration of design and production planning based on the product model approach. The final outcome is that the main contractor can utilise information coming from designers as input in its own tendering and cost estimation applications. The key methodology used for describing the information management process throughout the building process life-cycle was IDEF0. The analysis of the current process (as-is), in the form of an IDEF0 model, helped in identifying the main problems of current practice. The target process (to-be) definition was based on product model utilisation and takes into account the possibilities for process reengineering supported by product data technology. One specific requirement was deemed important in view of the anticipated developments in the area of data exchange; the target system should be structured in such a way that it could easily be adapted to receive data according to the emerging Industry Foundation class (IFC) core model schemas. The overall result of the research reported in this paper is that the product model approach can be used for a substantially reengineered information management process of a main contractor, especially in design and constructdesign/build type contracts.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Change Management and Change Process Model for the Iranian Construction Industry

Changes are inevitable in construction projects. They could lead to disruptive impacts on the quality, schedule and budget of projects. Identifying changes and anticipating their consequences can help project teams mitigate these negative impacts. As a result, a change process model has been defined to improve this procedure. At first the present paper the defines some of the key terms in this ...

متن کامل

Implementation of the integrated management dashboard for learning processes based on ISO 29990

The current research is trying to identify the effective modules (system modules) that form the integrated e-learning dashboard for educational processes and learning opportunities based on ISO 29990 in the municipality of Tehran. The educational process management system, which is currently providing classroom training services, is able to improve the situation by incorporating integrated mana...

متن کامل

Project Manager Competency Model based on ANP Method in Construction Projects

Most developed countries have already accepted‘’ Competency’’ as the major factor in making management more competitive, therefore they have discovered the importance of Qualification Models and their application to cause human resources growth. Consequently, their aim is to improve the qualification of their human resources, and to reach this end, considering different ways of assessing compet...

متن کامل

Time Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry

This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time horizons. Being trained by a locally linear model tree (LOLIMOT) learning algorithm, the model is int...

متن کامل

A Model for Prioritizing the Risks Associated with Road Construction Projects Based on Generalized Secondary Goal

   This paper aims at providing a new model based on Data Envelopment Analysis (DEA) to prioritize project risks. It is clear that the large amounts of involved capitals, the long term of infrastructure projects’ implementation, and the project management problems in on-time completion of projects indicate the necessity of paying particular attention to this issue and conducting applied researc...

متن کامل

New Realities of the Enterprise Management System Information Support: Economic and Mathematical Models and Cloud Technologies

The paper focuses on the urgency of the implementation of cloud technologies, which are a necessary condition for the development of enterprise management systems, give rise to a complex of insufficiently studied phenomena and processes and determine the need to find new tools in making and implementing reasonable management decisions. In the process of research, the sequence of construction an...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003