Multi-project scheduling with two-stage decomposition

نویسندگان

  • Anil Can
  • Gündüz Ulusoy
چکیده

A non-preemptive, zero time lag multi-project scheduling problem with multiple modes and limited renewable and nonrenewable resources is considered. A 2stage decomposition approach is adopted to formulate the problem as a hierarchy of 0-1 mathematical programming models. At stage one; each project is reduced to a macro-activity with macro-modes. The macro-activities are combined into a single macro-activity network over which the macro-activity scheduling problem (MP) is defined, where the objective is the maximization of the net present value with positive cash flows and renewable resource requirements are time-dependent. An exact solution procedure and a genetic algorithm (GA) approach are proposed for solving MP. GA is also employed to generate an initial solution for the exact solution procedure. The first stage terminates with a post-processing procedure to distribute the remaining resource capacities. Using the start times and the resource profiles obtained in stage one each project is scheduled in stage two for minimum makespan. Three new test problem sets are generated with 81, 84 and 27 problems each and three different configurations of solution procedures are tested.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Modified Pareto archived evolution strategy for the multi-skill project scheduling problem with generalized precedence relations

In this research, we study the multi-skill resource-constrained project scheduling problem, where there are generalized precedence relations between project activities. Workforces are able to perform one or several skills, and their efficiency improves by repeating their skills. For this problem, a mathematical formulation has been proposed that aims to optimize project completion time, reworki...

متن کامل

A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project

This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...

متن کامل

A Multi-objective optimization model for project scheduling with time-varying resource requirements and capacities

Proper and realistic scheduling is an important factor of success for every project. In reality, project scheduling often involves several objectives that must be realized simultaneously, and faces numerous uncertainties that may undermine the integrity of the devised schedule. Thus, the manner of dealing with such uncertainties is of particular importance for effective planning. A realistic sc...

متن کامل

Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms

The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

متن کامل

Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition

In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Annals OR

دوره 217  شماره 

صفحات  -

تاریخ انتشار 2014