Time-Constrained Scheduling of Weighted Packets on Trees and Meshes1
نویسندگان
چکیده
The time-constrained packet routing problem is to schedule a set of packets to be transmitted through a multinode network, where every packet has a source and a destination (as in traditional packet routing problems) as well as a release time and a deadline. The objective is to schedule the maximum number of packets subject to deadline constraints. This problem is studied in [1], where it is shown that the problem is NP-Complete even when the underlying topology is a linear array. Approximation algorithms are also provided in [1] for the linear array and the unidirectional ring for both the case where packets may be buffered in transit and the case where they may not be. In this paper we extend the results of [1] in two directions. First, we consider the more general network topologies of trees and two-dimensional meshes. Second, we associate with each packet a measure of utility, called a weight, and study the problem of maximizing the total weight of the packets that are scheduled subject to their timing constraints. For the bufferless case, we provide constant factor approximation algorithms for the time-constrained scheduling problem with weighted packets on trees and meshes. We also provide logarithmic approximations for the same problems in the buffered case. These results are complemented by new lower bounds, which demonstrate that we cannot hope to achieve the same results for general network topologies. For example, we show that if k packets are required to follow prescribed paths in an arbitrary graph, then unless NP = ZPP, there is no polynomial-time k1−ε-approximation, for any ε > 0, to the optimal set of packets that can be scheduled.
منابع مشابه
The preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach
Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...
متن کاملA Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
متن کاملA hybrid GRASP algorithm for minimizing total weighted resource tardiness penalty costs in scheduling of project networks
In this paper, we consider scheduling of project networks under minimization of total weighted resource tardiness penalty costs. In this problem, we assume constrained resources are renewable and limited to very costly machines and tools which are also used in other projects and are not accessible in all periods of time of a project. In other words, there is a dictated ready date as well as a d...
متن کاملA chance-constrained multi-objective model for final assembly scheduling in ATO systems with uncertain sub-assembly availability
A chance-constraint multi-objective model under uncertainty in the availability of subassemblies is proposed for scheduling in ATO systems. The on-time delivery of customer orders as well as reducing the company's cost is crucial; therefore, a three-objective model is proposed including the minimization of1) overtime, idletime, change-over, and setup costs, 2) total dispersion of items’ deliver...
متن کاملFuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2003