Scheduling unit-length jobs with precedence constraints of small height
نویسندگان
چکیده
We consider the problem of scheduling unit-length jobs on identical machines subject to precedence constraints. We show that natural scheduling rules fail when the precedence constraints form a collection of stars or a collection of complete bipartite graphs. We prove that the problem is in fact NP-hard on collections of stars when the input is given in a compact encoding, whereas it can be solved in polynomial time with standard adjacency list encoding. On a subclass of collections of stars and on collections of complete bipartite graphs we show that the problem can be solved in polynomial time even when the input is given in compact encoding, in both cases via non-trivial algorithms.
منابع مشابه
Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints
This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...
متن کاملSingle Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs
This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...
متن کاملSINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملScheduling Unit-time Operation Jobs on Identical Parallel Machines and in a Flow Shop: Complexity and Correlation
This paper considers the complexity and the correlation of scheduling unit-time jobs on identical parallel machines and unit-time ow-shop scheduling under precedence constraints. It is shown that, in the case of chain-like precedence constraints, the nonpre-emptive parallel-machines problem and the ow-shop problem to minimize maximum or total completion time can be solved in polynomial time, an...
متن کاملMulti-objective Unrelated Parallel Machines Scheduling with Sequence-dependent Setup times and Precedence Constraints
This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Oper. Res. Lett.
دوره 42 شماره
صفحات -
تاریخ انتشار 2014