Near optimal and optimal solutions for an integrated employee timetabling and production scheduling problem
نویسندگان
چکیده
This paper deals with integrated employee timetabling and production scheduling problem. At the first level, we have to manage a classical employee timetabling problem. At the second level, we aim at supplying a feasible production schedule for a set of interruptible tasks with qualification requirements and time-windows. Instead of using a hierarchical approach, we try here to integrate the two stages and propose an exact method based on a specific decomposition and a cut generation process to solve the resulting problem. This exact two-stage procedure has the double advantage to converge to optimal solutions but also to find quickly near optimal solutions. The relevance of this approach is discussed here through experimental results.
منابع مشابه
A discrete-event optimization framework for mixed-speed train timetabling problem
Railway scheduling is a complex task of rail operators that involves the generation of a conflict-free train timetable. This paper presents a discrete-event simulation-based optimization approach for solving the train timetabling problem to minimize total weighted unplanned stop time in a hybrid single and double track railway networks. The designed simulation model is used as a platform for ge...
متن کاملA new approach in graph- based integrated production and distribution scheduling for perishable products
This study is concerned with how the quality of perishable products can be improved by shortening the time interval between production and distribution. As special types of food such as dairy products decay fast, the integration of production and distribution scheduling (IPDS) is investigated. An integrated scheduling of both processes improves the performance and costs because the separated sc...
متن کاملMILP Formulation and Genetic Algorithm for Non-permutation Flow Shop Scheduling Problem with Availability Constraints
In this paper, we consider a flow shop scheduling problem with availability constraints (FSSPAC) for the objective of minimizing the makespan. In such a problem, machines are not continuously available for processing jobs due to preventive maintenance activities. We proposed a mixed-integer linear programming (MILP) model for this problem which can generate non-permutation schedules. Furthermor...
متن کاملIntegrated Procurement, Production and Delivery Scheduling in a Generalized three Stage Supply Chain
In this research, we investigate a three-stage supply chain with one supplier, several manufacturers and multiple retailers where the supplier provides a common raw material to each manufacturer, who in turn uses a single stage production facility to convert it into final products that are delivered at fixed lot sizes to retailers. An integrated economic procurement, production, and delivery mo...
متن کاملAn Evolutionary Algorithm Based on a Hybrid Multi-Attribute Decision Making Method for the Multi-Mode Multi-Skilled Resource-constrained Project Scheduling Problem
This paper addresses the multi-mode multi-skilled resource-constrained project scheduling problem. Activities of real world projects often require more than one skill to be accomplished. Besides, in many real-world situations, the resources are multi-skilled workforces. In presence of multi-skilled resources, it is required to determine the combination of workforces assigned to each activity. H...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2017