Building an integrated IT governance platform at the BMW Group
نویسندگان
چکیده
IT management has many facets, defining blueprints and guidelines for application architectures or planning the further development of the IT landscape are two typical examples. The BMW Group established four IT management processes for strategy, architecture, planning and control, which are linked to the IT project life cycle. But if these processes are not supported by an enterprise architecture management process, concentrating on the architecture on a holistic and abstract level, there still retains room for improvement. In this paper, we describe each process and how IT efficiency and IT effectiveness can be greatly improved by linking these processes using an integrated IT governance platform. We give some insights, which techniques are used in the processes, how the processes are linked and which functionalities for an integrated IT governance platform are needed.
منابع مشابه
Social Network, Joint Image Building and Adaptation Toward Water Governance (Case Study: Taleghan Watershed)
There is a multifaceted approach of water resource in a watershed, which is accompanied by complexity and issues such as the interaction of natural and human systems. Achieving the consistent governance of water resources is one of the most important management approaches in the water sector, which requires a coherent structure of knowledge transfer and information on the organizations stakehol...
متن کاملAn Efficient Double Skin Façade for an Office Building in Shiraz City
Energy efficiency in office buildings has been the center of attention for many researches. This special attention is due to highly energy consumption in this building type. Refinement of facade and building’s envelop is a good approach to reduce buildings energy requirements. Double skin facade concepts are commonly used to achieve that object. Although the concept is not new, there is a growi...
متن کاملDesigning a Model for Improving the Country's Health System with an Emphasis on Governance Strategies
Background and Aim: Health systems have played an important role in improving and increasing life expectancy. However, there is a large gap between health systems’ potential and their current performance, most of which relate to governance issues. The purpose of this study is to provide a model for improving the governance of the country's health system. Materials and Methods: The present stud...
متن کاملKindergarten Children's Interaction Platform (Case Study on the Integration of children with movement disorders and normal children )
Undoubtedly one of the most important and most influential periods in one’s life is the childhood period. Given that children during this period of their lives are confronted with the essential concepts and some of the distresses and social beliefs that are influential in the development of their habits, characters, and skill sets. As a result, the benefits of appropriate education conforming t...
متن کاملINTELLIGENT BUILDING ASSESSMENT BASED ON AN INTEGRATED MODEL OF FUZZY ANALYTIC HIERARCHY PROCESS AND FUZZY PREFERENCE DEGREE APPROACH (FAHP-FPDA)
Intelligent building (IB) technologies have widespread applications in the building design and development. In this regard, it is necessary to develop intelligent building assessment models in order to satisfy the clients, professionals, and occupants' growing demands. To this end, this paper proposes an integrated analytic hierarchy process (AHP) and preference degree approach (PDA) under the ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- IJBPIM
دوره 2 شماره
صفحات -
تاریخ انتشار 2007