Planning, scheduling and uncertainty in the sequence of future events

نویسندگان

  • B. R. Fox
  • Karl G. Kempf
چکیده

Scheduling in the factory setting ie compounded by computational comple:Aty and temporal uncertainty. Together, these two factors guarantee that the proceee of constructing an optimal schedule will be very costly and the chances of e:eecuting that schedule are vef11 slight. Temporal uncertainty in the e:eecution time environment can be oflset by 1everal methode: eliminate uncertainty by careful engineering, reduce uncertainty by using more powerful sensor•, restore certainty whenever it ie lost, quantify and circumscribe the remaining uncertainty. UnfortunatelfiJ the•e methode focus erzclusively on the eourcee of uncertainty and fail to appl'IJ lmowledge of the ta8Q which are to be tcheduled. A complete solution mutt teek to adapt the schedule of activities to be performed according to the evolving state of the world. The ezample of vision directed ueembl'IJ ie presented which illultratee that the principle of lea•t commitment, in the creation of a plan, in the representation of a 1chedule, and in the e:eecution of a schedule, enable• a robot to operate intelligently and efliciently, even in the presence of considerable uncertainty in the sequence of future event•. 1McDonnell Dough1.s Research Laboratories Artificial Intelligence Technology Group Dept 225/Bldg 305/Level 2E POB 516, St. Louis, MO, USA 63166 2 Arttnctal Intelltgence Center FMC Corporation 1185 Coleman Avenue Santa Clara, CA, USA 95052 1. Statement of the Problem The problem of sequencing and scheduling is to determine, in advance, when some set of events and activities should occur. The events and activities may be subject to some order­ ing constraints; the time of occurrence or the duration of some activities may be fixed; there may be some cost ass ociated with the time that an activity is performed or with the rate with which it progresses. The times selected for these events and activities must conform to the constraints, expected times and durations, and must generally minimize the associated costs. In problems which are over constrained, the selected times must at least conform to a rational relaxation of the given constraints. Scheduling in the factory setting is com­ pounded by two factors1. The first is comple:Aty. Most scheduling problems are NP­ hard. The number of potential schedules grows exponentially with the number of activities to be scheduled and the number of resources to be utilized. It is simply impossible to itemize and evaluate every possible schedule in order to find the best .schedule. At the same time, there is no known method for finding the best schedule which does not exhaustively consider (at least implicitly) every possible schedule. The second factor ls uncertainty. Any schedule constructed in advance is based solely upon assumptions about the ordering, the times of occurrence and the durations of the activities. *This research was conducted under the McDonnell Douglas Independent Research and Development Program.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Irrigation scheduling and winter wheat grain yield estimation under precipitation uncertainty – A case study in Badjgah area (Fars Province, Iran)

Addressing deficit irrigation scheduling (DIS) for strategic crop production (especially wheat) under precipitation uncertainty is a priority for irrigation scheduling in drought conditions. This research investigated the precipitation uncertainty by enacting optimistic and pessimistic scenarios for the next 20 years by considering the statistical record of climate in Badjgah area. DIS was cond...

متن کامل

A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

متن کامل

Integrated Scheduling of Electric Vehicles and Demand Response Programs in a Smart Microgrid

Microgrid (MG) is one of the important blocks in the future smart distribution systems. The scheduling pattern of MGs affects distribution system operation. Also, the optimal scheduling of MGs will be result in reliable and economical operation of distribution system. In this paper, an operational planning model of a MG which considers multiple demand response (DR) programs is proposed. In the ...

متن کامل

Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach

Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...

متن کامل

Exact Mixed Integer Programming for Integrated Scheduling and Process Planning in Flexible Environment

This paper presented a mixed integer programming for integrated scheduling and process planning. The presented process plan included some orders with precedence relations similar to Multiple Traveling Salesman Problem (MTSP), which was categorized as an NP-hard problem. These types of problems are also called advanced planning because of simultaneously determining the appropriate sequence and m...

متن کامل

A chance-constrained multi-objective model for final assembly scheduling in ATO systems with uncertain sub-assembly availability

A chance-constraint multi-objective model under uncertainty in the availability of subassemblies is proposed for scheduling in ATO systems. The on-time delivery of customer orders as well as reducing the company's cost is crucial; therefore, a three-objective model is proposed including the minimization of1) overtime, idletime, change-over, and setup costs, 2) total dispersion of items’ deliver...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1986