A Repair-based Approach for Reactive Scheduling in Job Shop Environment
نویسندگان
چکیده
An important practical problem in real world schedule execution is the occurrence of unforeseen events. When any changes in a production environment occur, the schedule has to be revised. Considering time consuming and shop floor nervousness, reactive repair of a disrupted schedule is a better alternative to total rescheduling. Most of the researchers have focused on heuristic based schedule repair techniques, as these techniques are easy to implement. Among these, right shift rescheduling is well known. This paper discusses how GENET network may be used to model and deal with the local disruptions that are frequently encountered in job shop environment, such as machine breakdown or urgent job (i.e. due date change). A repair-based local search approach for repairing a schedule with the objective of minimizing the difference between the new and the original schedule is proposed. The approach contains progressive stochastic search scheme and several heuristics. Then the resulting repaired schedule is evaluated through a simulation study with the performance measures of efficiency and stability.
منابع مشابه
A Particle Swarm Optimization Approach to Joint Location and Scheduling Decisions in A Flexible Job Shop Environment
In traditional scheduling literature, it is generally assumed that the location of facilities are predetermined and fixed in advance. However, these decisions are interrelated and may impact each other significantly. Therefore finding a schedule and facility location has become an important problem as an extension of the well-known scheduling problems. In this research we consider joint decisio...
متن کاملA Hybrid Approach for Fuzzy Just-In-Time Flow Shop Scheduling with Limited Buffers and Deteriorating Jobs
This paper investigates the problem of just-in-time permutation flow shop scheduling with limited buffers and linear job deterioration in an uncertain environment. The fuzzy set theory is applied to describe this situation. A novel mixed-integer nonlinear program is presented to minimize the weighted sum of fuzzy earliness and tardiness penalties. Due to the computational complexities, the prop...
متن کاملA multi Agent System Based on Modified Shifting Bottleneck and Search Techniques for Job Shop Scheduling Problems
This paper presents a multi agent system for the job shop scheduling problems. The proposed system consists of initial scheduling agent, search agents, and schedule management agent. In initial scheduling agent, a modified Shifting Bottleneck is proposed. That is, an effective heuristic approach and can generate a good solution in a low computational effort. In search agents, a hybrid search ap...
متن کاملA New Approach in Job Shop Scheduling: Overlapping Operation
In this paper, a new approach to overlapping operations in job shop scheduling is presented. In many job shops, a customer demand can be met in more than one way for each job, where demand determines the quantity of each finished job ordered by a customer. In each job, embedded operations can be performed due to overlapping considerations in which each operation may be overlapped with the other...
متن کاملA Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)
Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...
متن کاملAn integrated approach for scheduling flexible job-shop using teaching–learning-based optimization method
In this paper, teaching–learning-based optimization (TLBO) is proposed to solve flexible job shop scheduling problem (FJSP) based on the integrated approach with an objective to minimize makespan. An FJSP is an extension of basic job-shop scheduling problem. There are two sub problems in FJSP. They are routing problem and sequencing problem. If both the sub problems are solved simultaneously, t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2005