Product due date assignment for complex assemblies

نویسندگان

  • D. P. Song
  • C. Hicks
  • C. F. Earl
چکیده

A method is described to assign product due dates for multistage assemblies with uncertain manufacturing and assembly process times. Earliest start times of operations are specified by a predetermined production plan and processing time distributions for operations are truncated at minimum processing times. The method systematically decomposes the complex product structures of multistage assemblies into two-stage subsystems. Both exact and approximate distributions of completion time for two-stage assemblies are developed. The latter is applied recursively to multistage assemblies to yield an approximate distribution of product completion time. Product due dates are assigned to either minimise earliness and tardiness costs or to meet a service target. This method is applied to examples which use manufacturing and assembly data from a capital goods company. The results are verified by simulation. r 2002 Elsevier Science B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

متن کامل

Simultaneous Due Date Assignment and Lot Sizing with Uncertain Flow Times

Due date assignment for customer orders has been studied in various productionenvironments using different modeling approaches. In this paper the researchers consider aproduction system in which the orders of several customers are produced in a single batch because ofthe economy of scale. If a batch is completed before receiving customer orders, inventory carryingcost is incurred but if it is c...

متن کامل

A Using Distributed Intelligent Agents for Due Date Assignment

This study intends to help manufacturers that use flexible job shops improve performance of due date assignment, that is, setting delivery times to jobs that arrive dynamically. High performing due date assignment enables achieving on-time delivery and quick response of delivery time to customer orders. Traditional methods for due date assignment are predefined equations that estimate the durat...

متن کامل

Reliability assessment of electronic assemblies under multiple interacting loading conditions

Aalto University, P.O. Box 11000, FI-00076 Aalto www.aalto.fi Author Juha Karppinen Name of the doctoral dissertation Reliability assessment of electronic assemblies under multiple interacting loading conditions Publisher School of Electrical Engineering Unit Department of Electronics Series Aalto University publication series DOCTORAL DISSERTATIONS 19/2013 Field of research Electronics integra...

متن کامل

Stage due date planning for multistage assembly systems

Coordinating due dates of operations throughout all stages of manufacturing and assembly is a problem especially for complex product structures with uncertainties in process times. A recursive procedure is described to estimate distributions of completion times for each operation. Stage due dates are then calculated to meet speci® ed service targets. Compared with plans from existing heuristic ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002