Dynamic scheduling of multiproduct pipelines with multiple delivery due dates

نویسندگان

  • Diego C. Cafaro
  • Jaime Cerdá
چکیده

Scheduling product batches in pipelines is a very complex task with many constraints to be considered. Several papers have been published on the ubject during the last decade. Most of them are based on large-size MILP discrete time scheduling models whose computational efficiency greatly iminishes for rather long time horizons. Recently, an MILP continuous problem representation in both time and volume providing better schedules at uch lower computational cost has been published. However, all model-based scheduling techniques were applied to examples assuming a static maret environment, a short single-period time horizon and a unique due-date for all deliveries at the horizon end. In contrast, pipeline operators generally se a monthly planning horizon divided into a number of equal-length periods and a cyclic scheduling strategy to fulfill terminal demands at period nds. Moreover, the rerouting of shipments and time-dependent product requirements at distribution terminals force the scheduler to continuously pdate pipeline operations. To address such big challenges facing the pipeline industry, this work presents an efficient MILP continuous-time frameork for the dynamic scheduling of pipelines over a multiperiod moving horizon. At the completion time of the current period, the planning horizon oves forward and the re-scheduling process based on updated problem data is triggered again over the new horizon. Pumping runs may extend over wo or more periods and a different sequence of batches may be injected at each one. The approach has successfully solved a real-world pipeline cheduling problem involving the transportation of four products to five destinations over a rolling horizon always comprising four 1-week periods. 2007 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Detailed Scheduling of Oil Products Pipelines with Parallel Batch Inputs at Intermediate Sources

Pipelines constitute the dominant inland transportation mode for crude oil and oil products. Lots of refined products such as gasoline, jet fuel and diesel are shipped from refineries and seaports to truck-loading terminals by multiproduct pipelines. Planning the operation of multiproduct pipelines is a very difficult task demanding efficient tools to get safe, on-time, low-cost and high-qualit...

متن کامل

On the Fixed Interval Due-date Scheduling Problem

WC consider the nonprccmptivc single machine scheduling problem with multiple due-dates (delivery dates). where the time between two consecutive due-dates is a constant. Given a set of jobs, we are interested in scheduling the jobs such that the sum of the total due-date cost and the total earliness cost is minimized with the constraint that each job must be finished at or before its due-date. ...

متن کامل

An approximation algorithm and FPTAS for Tardy/Lost minimization with common due dates on a single machine

This paper addresses the Tardy/Lost penalty minimization with common due dates on a single machine. According to this performance measure, if the tardiness of a job exceeds a predefined value, the job will be lost and penalized by a fixed value. Initially, we present a 2-approximation algorithm and examine its worst case ratio bound. Then, a pseudo-polynomial dynamic programming algorithm is de...

متن کامل

Role of batch size in scheduling optimization of flexible manufacturing system using genetic algorithm

Flexible manufacturing system (FMS) readily addresses the dynamic needs of the customers in terms of variety and quality. At present, there is a need to produce a wide range of quality products in limited time span. On-time delivery of customers’ orders is critical in make-to-order (MTO) manufacturing systems. The completion time of the orders depends on several factors including arrival rate, ...

متن کامل

An efficient MILP model for the short-term scheduling of single stage batch plants

This paper presents a multiple time grid continuous time MILP model for the short-term scheduling of single stage, multiproduct batch plants where the objective is the minimization of total cost or total earliness. It can handle both release and due dates and it can determine the products delivery dates explicitly if these need to be considered in the objective function. This formulation is com...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & Chemical Engineering

دوره 32  شماره 

صفحات  -

تاریخ انتشار 2008