Minimising the weighted number of tardy jobs in a hybrid flow shop with genetic algorithm
نویسندگان
چکیده
This paper considers a real-world industrial problem in order to minimize the (weighted) number of tardy jobs. This problem occurs in a company where due dates are associated with parts, and penalties incur when the parts are completed after the due dates, whatever the magnitude of the tardiness. Therefore, the objective function can be modelled as minimization of the (weighted) number of tardy jobs. The system studied is a hybrid flow shop with re-entrance (or recirculation). In order to deal with large size problems arising in real life, a Genetic Algorithm (GA) is implemented. A coding system, adapted to the considered problem, is designed, and existing crossover and mutation operators are adapted to this coding. To evaluate the effectiveness of the proposed method, it is tested against a commercial software package. The results show that the proposed GA performs well on the scheduling part for a given resource allocation, but it still requires an effective resource allocation procedure.
منابع مشابه
A Hybrid Approach for Fuzzy Just-In-Time Flow Shop Scheduling with Limited Buffers and Deteriorating Jobs
This paper investigates the problem of just-in-time permutation flow shop scheduling with limited buffers and linear job deterioration in an uncertain environment. The fuzzy set theory is applied to describe this situation. A novel mixed-integer nonlinear program is presented to minimize the weighted sum of fuzzy earliness and tardiness penalties. Due to the computational complexities, the prop...
متن کاملAn Effective Hybrid Genetic Algorithm for Hybrid Flow Shops with Sequence Dependent Setup Times and Processor Blocking
Hybrid flow-shop or flexible flow shop problems have remained subject of intensive research over several years. Hybrid flow-shop problems overcome one of the limitations of the classical flow-shop model by allowing parallel processors at each stage of task processing. In many papers the assumptions are generally made that there is unlimited storage available between stages and the setup times a...
متن کاملA novel hybrid genetic algorithm to solve the make-to-order sequence-dependent flow-shop scheduling problem
Flow-shop scheduling problem (FSP) deals with the scheduling of a set of n jobs that visit a set of m machines in the same order. As the FSP is NP-hard, there is no efficient algorithm to reach the optimal solution of the problem. To minimize the holding, delay and setup costs of large permutation flow-shop scheduling problems with sequence-dependent setup times on each machine, this pap...
متن کاملMinimizing the weighted number of tardy jobs in a hybrid flow shop with Genetic Algorithm
This paper considers a real-world industrial problem in order to minimize the (weighted) number of tardy jobs. This problem occurs in a company where due dates are associated with parts, and penalties incur when the parts are completed after the due dates, whatever the magnitude of the tardiness. Therefore, the objective function can be modelled as minimization of the (weighted) number of tardy...
متن کاملA New Multi-objective Job Shop Scheduling with Setup Times Using a Hybrid Genetic Algorithm
This paper presents a new multi objective job shop scheduling with sequence-dependent setup times. The objectives are to minimize the makespan and sum of the earliness and tardiness of jobs in a time window. A mixed integer programming model is developed for the given problem that belongs to NP-hard class. In this case, traditional approaches cannot reach to an optimal solution in a reasonable...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Int. J. Computer Integrated Manufacturing
دوره 22 شماره
صفحات -
تاریخ انتشار 2009