The optimization of road building schedule based on budget restriction

نویسندگان

  • Kerui Weng
  • Bo Qu
چکیده

Purpose – The purpose of this paper is to present a model to determine which roads to be built in each stage with limited budget. Design/methodology/approach – A multistage network discrete expansion model with budget restriction is formulated and a heuristic algorithm is developed by the technique of comparing the original shortest paths and the sum of crossed shortest paths to avoid computing the shortest paths matrix repeatedly. Findings – The optimal approach has a very significant effect in finding which roads to be built by the largest net benefit. Research limitations/implications – The paper discusses a new multistage network discrete expansion problem is the main research implications. Practical implications – The optimal choice for road building schedule of new urban district when budgets were limited. Originality/value – The paper presents a model and an algorithm for the optimization of road building schedule based on budget restriction.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Using Ant Colony Optimization for Infrastructure Maintenance Scheduling

For the optimal planning of maintenance schedules for infrastructural buildings (bridges, tunnels, etc) in urban road systems not only the budget has to be considered but also the impact on traffic to avoid unnecessary traffic jams. In a current research project we develop an optimization tool for this multiobjective problem based on ant colony optimization. In each iteration, the ants produce ...

متن کامل

VALUE ENGINEERING ANALYSIS FOR THE EDUCATIONAL BUILDINGS IN EGYPT

General Authority for Educational Buildings (GAEB) in Egypt is responsible for new construction and maintenance of the educational building [1]. According to the Sixth Five- Years Plan in Egypt, the program of educational structures includes new construction of about 2915 schools, with 39.8 thousand classes. Also, maintenance works for buildings about 1250 schools. These works needs a high budg...

متن کامل

An Analysis Method on Post-earthquake Traversability of Road Network Considering Building Collapse

This study aims at quantifying the influence on the traversability of road network of road network caused by building collapse in earthquake. To this end, an analysis method on post-earthquake traversability of road network considering building collapse is proposed. First, the time-history analysis of seismic response based on the multi-degree of freedom (MDOF) model is performed for regional b...

متن کامل

A Budgeting Model for the Safety Unit of an Under Construction Metro Station in Tehran Using a Robust Optimization

Background: The construction of metro lines is a high-risk project. Using a budget-based model for the safety units of metro construction projects can help safety managers to spend optimal budget allocation. The purpose of this study was to plan a budget model based on safety unit performance in an under construction metro station for better budget allocation using robust optimization. Methods...

متن کامل

OPTIMIZATION-BASED MONITORING-SUPPORTED CALIBRATION OF A THERMAL PERFORMANCE SIMULATION MODEL

Building performance simulation is being increasingly deployed beyond the building design phase to support efficient building operation. Specifically, the predictive feature of the simulation-assisted building systems control strategy provides distinct advantages in view of building systems with high latency and inertia. Such advantages can be exploited only if model predictions can be relied u...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Kybernetes

دوره 38  شماره 

صفحات  -

تاریخ انتشار 2009