Modeling Emissions of Construction and Mining Equipment by Tracking Field Operations

نویسندگان

  • K. Barati
  • X. Shen
چکیده

Construction and mining industries are using more than 20% of all non-road engines and listed as the third largest contributor to greenhouse gases (GHGs) emission globally. GHGs emitted from engines in construction and mining sites have not been fully investigated yet. Normally, government agencies and construction contractors estimate emitted pollution approximately based on consumed fuel for emission tax purpose. Despite the research conducted in this area in recent years, there is no accurate model to measure different GHGs emitted at operational level. This paper aims to develop an integrated framework to estimate emission rates of carbon monoxide (CO), carbon dioxide (CO2) and hydrocarbon (HC) from machinery employed in construction and mining sites. Real-time engine and operational data collected by Data Logger and GPS/INS instruments are analysed to model the emissions. The results are further validated by comparing against the outputs from a portable emission measurement system (PEMS). Specific process was carried out to synchronize the raw data collected from three different channels. The emission measurement model also considers fuel-to-emission chemical relations, engine specifications and effective factors on different pollutants emission rate. The model developed in this research has been validated through comparing the estimation results with the data collected by PEMS in the laboratory experiments. As results show, the correlation coefficient (R 2 ) of ordinary least square (OLS) regression relations of emissions is higher than 0.9. Also, the results of the analysed data by SPSS Software show R 2 of engine load estimation model is

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimal Earthmoving Fleet Size for Minimising Emissions and Cost

Traditionally, the earthmoving operations have been developed based on the minimum cost per production criterion. Nowadays, due to the negative impacts of the emissions on the environment, there is an increasing public awareness to reduce the emissions from the earthmoving operations. Different management strategies can be employed to reduce emissions, amongst other things, which can also resul...

متن کامل

Energy Delivery at Oil and Gas Wells Construction in Regions With Harsh Climate

Energy delivery at well construction in regions with hard climate is distinguished by variable demand in electric and heat power. Energy consumption of drilling equipment, production and living facilities varies greatly during the year, depending on power load charts and climate conditions. Power supply of remote well construction sites is mostly accomplished by operating autonomous power sourc...

متن کامل

Real-time Spatial Detection and Tracking of Resources in a Construction Environment

Construction accidents with heavy equipment and bad decision making can be based on poor knowledge of the site environment and in both cases may lead to work interruptions and costly delays. Supporting the construction environment with real-time generated three-dimensional (3D) models can help preventing accidents as well as support management by modeling infrastructure assets in 3D. Such model...

متن کامل

Numerical Analysis of the Primer Location Effect on Ground Vibration Caused by Blasting

Ground vibration is one of the undesirable results of blasting operations. Different methods have been proposed to predict and control ground vibration that is caused by blasting. These methods can be classified as laboratory studies, fieldwork and numerical modeling. Among these methods, numerical modeling is the one which saves time and cuts costs since it takes into account the basic princip...

متن کامل

Knowledge-Based Simulation Modeling of Construction Fleet Operations Using Multimodal-Process Data Mining

In order to develop a realistic simulation model, it is critical to provide the model with factual input data based on the interactions and events that take place between real entities. However, the existing trend in simulation of construction fleet activities is based on estimating input parameters such as activity durations using expert judgments and assumptions. Not only may such estimations...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015