Multi-Objective Optimisation in Time Series: Time Delay Agreement
نویسندگان
چکیده
Several time delay estimates have been reported for the quasar Q0957+561. They come from distinct data sets and published separately. This paper presents a methodology to estimate a single time delay given several data sets by using multi-objective optimisation. We use General Regression Neural Networks (GRNN) to estimate the time delay, which is one of the most accurate time delay estimators – and faster. For the time delay agreement, we use hill-climbing search. We found that the best agreement for the time delay on Q0957+561 is ∆ = 420 days.
منابع مشابه
Presenting a Multi-Objective Mathematical Model for Time-Cost trade off Problem Considering Time Value of Money and Solve it by MOPSO Algorithm
The time - cost tradeoff problem is one of the most critical issues in the project scheduling field and so far, a lot of research has been done with a variety of quantitative and qualitative approaches on this subject. In this research, we intend to provide a two - objective mathematical model which balances crash and delay for activities. So that it provides the right tools for decision makers...
متن کاملA Hybrid Time Series Clustering Method Based on Fuzzy C-Means Algorithm: An Agreement Based Clustering Approach
In recent years, the advancement of information gathering technologies such as GPS and GSM networks have led to huge complex datasets such as time series and trajectories. As a result it is essential to use appropriate methods to analyze the produced large raw datasets. Extracting useful information from large data sets has always been one of the most important challenges in different sciences,...
متن کاملMitigation of Tropospheric Delay on InSAR Interseismic Displacements
One of the major challenges of Interferometric Synthetic Aperture Radar (InSAR) technique is the existence of tropospheric effect on the results. The tropospheric effect is due to the changes of atmospheric parameters including temperature, pressure, and humidity between the master and slave images. In this research, two different methods based on spatial-temporal filters and calculation of pha...
متن کاملRiver Discharge Time Series Prediction by Chaos Theory
The application of chaos theory in hydrology has been gaining considerable interest in recent years.Based on the chaos theory, the random seemingly series can be attributed to deterministic rules. Thedynamic structures of the seemingly complex processes, such as river flow variations, might be betterunderstood using nonlinear deterministic chaotic models than the stochastic ones. In this paper,...
متن کاملMulti-objective optimization of discrete time–cost tradeoff problem in project networks using non-dominated sorting genetic algorithm
The time–cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate e...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2011