An Interval Parameter Two-Stage Stochastic Approach to Optimize Budget and Schedule in Construction Management

نویسندگان

  • Jinxin Zhu
  • Gordon Huang
چکیده

An interval parameter two-stage stochastic model for project budgeting and scheduling is developed to dealing with the uncertainties residing in the project management. The model focuses on the probability distribution in activity durations and the uncertainties expressed as intervals in costs. It minimizes the inexact costs (direct costs, indirect costs and penalties) with reference to the specified project completion time and the durations of activities estimated from two-stage stochastic programming. The proposed approach for budgeting and scheduling is a hybrid of two stage stochastic programming and inexact optimization. Solutions obtained from the model will provide a reasonable crashing time plan to accomplish given projects on specific time and come up a lowest cost plan for tardiness. This approach can effectively reflect the interactive relationships among all the uncertain system components. The plan provides useful decision support for project managers through these post-optimality analyses. The developed model is applied to a case study to illustrate its feasibility of dealing the actual project management decision problems. The paper implements the model to a gas pipeline construction project with specified completion time and milestone allocating tasks as the case study. The proposed model provides a systematic framework that facilitates the decision making process and enable project managers to justify the range of the solutions when the decision variables are intervals. *Corresponding author: Gordon Huang, Institute for Energy, Environment and Sustainable Communities, University of Regina, 3737 Wascana Parkway, Regina, SK, S4S 0A2, Canada; Tel: 306-585-4111; E-mail: [email protected] Received March 02, 2016; Accepted April 25, 2016; Published April 27, 2016 Citation: Zhu J, Huang G (2016) An Interval Parameter Two-Stage Stochastic Approach to Optimize Budget and Schedule in Construction Management. J Civil Environ Eng 6: 228. doi:10.4172/2165-784X.1000228 Copyright: © 2016 Zhu J, et al. This is an open-access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Stochastic Model for Water Resources Management

Irrigation water management is crucial for agricultural production and livelihood security in many regions and countries throughout the world. Over the past decades, controversial and conflictladen water-allocation issues among competing municipal, industrial and agricultural interests have raised increasing concerns. Particularly, growing population, varying natural conditions and shrinking wa...

متن کامل

Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint

Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...

متن کامل

Reconfiguration of Supply Chain: A Two Stage Stochastic Programming

In this paper, we propose an extended relocation model for warehouses configuration in a supply chain network, in which uncertainty is associated to operational costs, production capacity and demands whereas, existing researches in this area are often restricted to deterministic environments. In real cases, we usually deal with stochastic parameters and this point justifies why the relocation m...

متن کامل

Two-stage fuzzy-stochastic programming for parallel machine scheduling problem with machine deterioration and operator learning effect

This paper deals with the determination of machine numbers and production schedules in manufacturing environments. In this line, a two-stage fuzzy stochastic programming model is discussed with fuzzy processing times where both deterioration and learning effects are evaluated simultaneously. The first stage focuses on the type and number of machines in order to minimize the total costs associat...

متن کامل

Supplier Selection in Grey Environment: A Grey, AHP, Bulls-Eye and ELECTRE Approach

In recent years, the problem of selecting and evaluating the suppliers in supply chain management has aroused considerable interest in business firms. Owing to the development of information systems, reaching an appropriate decision for adopting discrete methods is a need. The researchers intend to present a new model in this paper as a contributing factor in the grey environment in which the r...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016