Multi-mode renewable resource-constrained allocation in PERT networks

نویسندگان

  • Siamak Baradaran
  • Seyyed M. T. Fatemi Ghomi
  • Mohammad Ranjbar
  • S. S. Hashemin
چکیده

This paper presents a hybrid metaheuristic algorithm (HMA) for Multi-Mode Resource-Constrained Project Scheduling Problem (MRCPSP) in PERT networks. A PERT-type project, where activities require resources of various types with random duration, is considered. Each activity can be accomplished in one of several execution modes and each execution mode represents an alternative combination of resource requirements of the activity and its duration. The problem is to minimize the regular criterion namely project’s makespan by obtaining an optimal schedule and also the amount of different resources assigned to each activity. The resource project scheduling model is strongly NP-hard, therefore a metaheuristic ulti-mode resource-constrained llocation enewable resource catter search ath relinking enetic algorithm algorithm is suggested namely HMA. In order to validate the performance of new hybrid metaheuristic algorithm, solutions are compared with optimal solutions for small networks. Also the efficiency of the proposed algorithm, for real world problems, in terms of solution quality and CPU time, is compared to one of the well-known metaheuristic algorithms, namely Genetic Algorithm of Hartmann (GAH). The computational results reveal that the proposed method provides appropriate results for small networks and real world problems. © 2011 Elsevier B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A heuristic method for consumable resource allocation in multi-class dynamic PERT networks

This investigation presents a heuristic method for consumable resource allocation problem in multi-class dynamic Project Evaluation and Review Technique (PERT) networks, where new projects from different classes (types) arrive to system according to independent Poisson processes with different arrival rates. Each activity of any project is operated at a devoted service station located in a n...

متن کامل

A Multi Objective Fibonacci Search Based Algorithm for Resource Allocation in PERT Networks

The problem we investigate deals with the optimal assignment of resources to the activities of a stochastic project network. We seek to minimize the expected cost of the project include sum of resource utilization costs and lateness costs. We assume that the work content required by the activities follows an exponential distribution. The decision variables of the model are the allocated resourc...

متن کامل

A Hybrid Heuristic Rule for Constrained Resource Allocation in PERT Type Networks

This paper presents a hybrid heuristic for constrained resource allocation in PERT type networks. Here, the assumption is made that the constrained resource is renewable for allocation to the activities of project. In addition, we consider finish-start precedence constraints with zero time lag. The activities durations are independent continuous random variables, preemption is not allowed and r...

متن کامل

Constrained consumable resource allocation in alternative stochastic networks via multi-objective decision making

Many real projects complete through the realization of one and only one path of various possible network paths. Here, these networks are called alternative stochastic networks (ASNs). It is supposed that the nodes of considered network are probabilistic with exclusive-or receiver and exclusive-or emitter. First, an analytical approach is proposed to simplify the structure of t...

متن کامل

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Appl. Soft Comput.

دوره 12  شماره 

صفحات  -

تاریخ انتشار 2012