The Maturing Concept of Estimating Project Cost Contingency - a Review

نویسنده

  • David Baccarini
چکیده

Contingency is a ubiquitous component of project cost estimating. This paper provides a review of the literature pertaining to the estimating of project cost contingency. It describes the flaws of the tradition percentage method for estimating project cost contingency and sets out more robust estimation methods regression analysis, Monte Carlo simulation and artificial neutral networks. In particular, the application of regression analysis for predicting project cost contingency is reviewed in detail as a prelude to the author’s research into the development and testing of a regression model for forecasting project cost contingency for engineering construction projects.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Estimating Project Cost Contingency – Beyond the 10% syndrome

Projects require budgets to set the sponsor’s financial commitment and provide the basis for cost control and measurement of cost performance. A key component of a project budget is cost contingency. This paper reviews the traditional approach of estimating project cost contingency by means of a percentage addition to the base estimate and analyses its many conceptual flaws. Over the past decad...

متن کامل

Development of a Generic Risk Matrix to Manage Project Risks

A generic risk matrix is presented for use identifying and assessing project risks quickly and cost effectively. It assists project managers with few resources to perform project risk analysis. The generic risk matrix (GRM) contains a broad set of risks that are categorized and ranked according to their potential impact and probability of occurrence. The matrix assists PMs in quickly identifyin...

متن کامل

Multi-objective optimization of time-cost-quality-carbon dioxide emission-plan robustness in construction projects

Today, the construction industry is facing intense competition and success in this competition depends on several factors. Project managers try to minimize project time and cost, carbon dioxide emission and at the same time maximizing the quality of project and its plan robustness. In this paper, study construction project scheduling considering a discrete trade-off between time, cost, quality,...

متن کامل

Risk-Based Cost Estimation

ost estimation for an engineering project traditionally involves development of an “engineer’s estimate” of the project cost to which contingency is added to develop the “total project cost.” Contingency is used to reflect the fact that regardless of the diligence and competence of the estimator, there is uncertainty in the final cost of the project. Material costs change over time, markups and...

متن کامل

Intuitive and Usable Risk-based Cost Contingency Estimation Model for Generalcontracting Firms

Construction projects inherently possess uncertainties, which represent risks and opportunities to contracting business entities. Their business success, therefore, is largely defined by how these uncertainties are managed from the planning and estimating to execution phases. Traditionally risks, in particular, have been dealt by converting them into the form of a contingency. Ironically, howev...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006