The TRAINS project: a case study in building a conversational planning agent
نویسندگان
چکیده
The Trains project is an eeort to build a conversationally proocient planning assistant. A key part of the project is the construction of the Trains system, which provides the research platform for a wide range of issues in natural language understanding, mixed-initiative planning systems, and representing and reasoning about time, actions and events. Four years have now passed since the beginning of the project. Each year we have produced a demonstration system that focused on a dialog that illustrates particular aspects of our research. The commitment to building complete integrated systems is a signiicant overhead on the research, but we feel it is essential to guarantee that the results constitute real progress in the eld. This paper describes the goals of the project, and our experience with the eeort so far.
منابع مشابه
Real-Time Building Information Modeling (BIM) Synchronization Using Radio Frequency Identification Technology and Cloud Computing System
The online observation of a construction site and processes bears significant advantage to all business sector. BIM is the combination of a 3D model of the project and a project-planning program which improves the project planning model by up to 6D (Adding Time, Cost and Material Information dimensions to the model). RFID technology is an appropriate information synchronization tool between the...
متن کاملEffect of Rail Corrugation on the Amount of Train Induced Vibrations near a Historical Building
The evaluation and control of the trains induced vibrations needs even more attention in the case of underground tracks which passes near to monuments and historical sites. The rail corrugations which occur due to the wheels’ impulse loads during the operation period of underground railway tracks, usually amplify the ground borne noise and vibration. In the current study, the mentioned phenomen...
متن کاملAchieving green architecture through the use of BIM (Case study: Faculty of Architecture - Urban Planning, Civil Engineering and Mechanics, Iran University of Science and Technology)
Introduction: Building information modeling (BIM) has become widespread in developed countries, while in Iran, BIM-based software has received less attention due to some reasons. With the increase of population and the absence of a local publication, we have witnessed constructions contrary to international standards (architecture and energy), which has led to more use of fossil fuels that woul...
متن کاملBuilding a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem
Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient mode...
متن کاملBuilding a narrative conversational agent using a component-based architecture
This paper describes a component based-model for a Narrative Conversational Agent. This project has to interact with a child in a storytelling environment as natural as possible and replace the previous version of the platform, where the actions were triggered manually by a psychologist. The prototype was carried out as a student project, and had the goal to integrate existing components and li...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- J. Exp. Theor. Artif. Intell.
دوره 7 شماره
صفحات -
تاریخ انتشار 1995