Intelligent V Ehicle Scheduling: Experiences with a Constraint-based Approach
نویسنده
چکیده
This paper describes the experiences and insights that AIAI have gained during the development of an intelligent vehicle scheduling system using a commercially available library for constraint based programming The application involves the assignment of drivers and vehicles for single drop deliveries under a wide range of regulations physical compatibility restrictions and operating preferences The aims of the project were to produce good quality schedules within a limited time while minimizing operating costs In addition to generating predictive schedules the system provides some support for user interaction with the schedule generation process and reactive scheduling
منابع مشابه
Agent-based approach for cooperative scheduling
This paper studies the multi-factory production (MFP) network scheduling problem where a number of different individual factories join together to form a MFP network, in which these factories can operate more economically than operating individually. However, in such network which known as virtual production network with self-interested factories with transportation times, each individual facto...
متن کاملSolving the Dynamic Job Shop Scheduling Problem using Bottleneck and Intelligent Agents based on Genetic Algorithm
The problem of Dynamic Job Shop (DJS) scheduling is one of the most complex problems of machine scheduling. This problem is one of NP-Hard problems for solving which numerous heuristic and metaheuristic methods have so far been presented. Genetic Algorithms (GA) are one of these methods which are successfully applied to these problems. In these approaches, of course, better quality of solutions...
متن کاملA Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint
In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...
متن کاملSolving Integrated Process Planning and Scheduling Problem with Constraint Programming
Process planning and scheduling are two important manufacturing functions which are usually performed sequentially. However, due to the uncertainties and disturbances frequently occurring in the manufacturing environment, the separately conducted process plan and shopfloor schedule may lose their optimality, becoming ineffective or even infeasible. Researchers have considered the potential of i...
متن کاملAn intelligent optimal production scheduling approach using constraint-based search and agent-based collaboration
This research introduces an intelligent approach for identifying the optimal production schedule to satisfy product and manufacturing constraints. In this approach, product constraints are modeled using a feature-based product representation scheme. Manufacturing constraints are described as available resources including facilities and persons. Manufacturing requirements for producing the produ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1994