An optimization-based model for maximizing the benefits of fast-track construction activities

نویسندگان

  • Youssef Khoueiry
  • Issam M. Srour
  • Ali A. Yassine
چکیده

Fast-track construction projects have become more popular in recent years in response to growing industry demand. By allowing downstream construction activities to start with incomplete information from upstream design activities, fast-tracking (through overlapping) allows for shorter project duration at the expense of potential rework. This leaves practitioners with the challenge of determining the optimal fast-tracking strategy to meet project schedule requirements while avoiding excessive amounts of rework. This paper presents an optimization-based model that serves as a decision support tool in scheduling fast-track construction activities. The model takes into consideration information exchange between upstream and downstream activities and uses the concepts of sensitivity and evolution to maximize the net benefits of fast-tracking. The model is illustrated on an ongoing construction project, which was analysed under various overlapping scenarios. The results indicate substantial time savings depending on the speed of evolution and sensitivity. The project schedule can be shortened by up to 50 days without causing excessive amounts of rework. Journal of the Operational Research Society (2013) 64, 1137–1146. doi:10.1057/jors.2013.30 Published online 13 March 2013

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Optimization Model for Maximizing the Benefits of Fast-tracking Construction Projects

Fast-track construction projects have become more popular in recent years in response to growing industry demand. By allowing a downstream activity to start with incomplete information from upstream activities, fast-tracking allows for shortening the project duration at the expense of an increased likelihood of rework. This leaves practitioners with the challenge of determining the optimal fast...

متن کامل

An Optimization Model for Financial Resource Allocation Towards Seismic Risk Reduction

This paper presents a study on determining the degree of effectiveness of earthquake risk mitigation measures and how to prioritize such efforts in developing countries. In this paper a model is proposed for optimizing funds allocation towards risk reduction measures (building retrofitting) and reconstruction process after potential earthquakes in a regional level. The proposed model seeks opti...

متن کامل

A Multi-objective optimization model for project scheduling with time-varying resource requirements and capacities

Proper and realistic scheduling is an important factor of success for every project. In reality, project scheduling often involves several objectives that must be realized simultaneously, and faces numerous uncertainties that may undermine the integrity of the devised schedule. Thus, the manner of dealing with such uncertainties is of particular importance for effective planning. A realistic sc...

متن کامل

A Budgeting Model for the Safety Unit of an Under Construction Metro Station in Tehran Using a Robust Optimization

Background: The construction of metro lines is a high-risk project. Using a budget-based model for the safety units of metro construction projects can help safety managers to spend optimal budget allocation. The purpose of this study was to plan a budget model based on safety unit performance in an under construction metro station for better budget allocation using robust optimization. Methods...

متن کامل

Cut-off Grade Optimization for Maximizing the Output Rate

In the open-pit mining, one of the first decisions that must be made in production planning stage, after completing the design of final pit limits, is determining of the processing plant cut-off grade. Since this grade has an essential effect on operations, choosing the optimum cut-off grade is of considerable importance. Different goals may be used for determining optimum cut-off grade. One of...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • JORS

دوره 64  شماره 

صفحات  -

تاریخ انتشار 2013