Methodological Issues of the Master Plan Schedule Construction in Mass Customization

نویسندگان

  • Clément Chatras
  • Vincent Giard
  • Mustapha Sali
  • C. Chatras
  • V. Giard
  • M. Sali
چکیده

Id: SCML10356 C. Chatras, V. Giard, M. Sali LAMSADE, Université Paris-Dauphine, Place de Lattre de Tassigny F75775 Paris, France Abstract In global mass customization supply chains, the geographical dispersion of plants complicates flow control. Because of the high product diversity, the MPS of the final assembly lines is defined for Alternative Modules (AMs). Analysis of the visible diversity, through a car configurator, shows restrictions in the combinations of AMs. Choices made by the customer from the visible diversity trigger choices in the non-visible diversity. Causes and formal representations of the relations between AMs are analyzed. The MPS construction rests on commercial forecasts, for few sets of AMs, and on production information. Their combination leads to a typology that decreases the number of MPSs to build. These MPSs can be defined either through the use of completely defined products, which implies a deterministic view of the MPS construction, or the direct use of planning bills of materials, which offers the possibility of managing, on stochastic bases, the production beyond the frozen horizon.In global mass customization supply chains, the geographical dispersion of plants complicates flow control. Because of the high product diversity, the MPS of the final assembly lines is defined for Alternative Modules (AMs). Analysis of the visible diversity, through a car configurator, shows restrictions in the combinations of AMs. Choices made by the customer from the visible diversity trigger choices in the non-visible diversity. Causes and formal representations of the relations between AMs are analyzed. The MPS construction rests on commercial forecasts, for few sets of AMs, and on production information. Their combination leads to a typology that decreases the number of MPSs to build. These MPSs can be defined either through the use of completely defined products, which implies a deterministic view of the MPS construction, or the direct use of planning bills of materials, which offers the possibility of managing, on stochastic bases, the production beyond the frozen horizon.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Integrate land and water use planning at the scale of the urban master plan

The survival of cities as living beings and their inhabitants depends on the supply of water. Numerous factors such as population growth, climate, drought, consumption pattern, amount of available water resources and utility network affect the equation of water supply and consumption. What has been less considered in the traditional planning process than ever before is the connection between la...

متن کامل

SUGI 27: Generating Randomization Schedules Using SAS(r) Programming

Randomization as a method of experimental control has been extensively used in clinical trials. Generating the randomization schedule has been an essential part of some trials. We discuss how to use SAS programming and SAS PROC PLAN to generate the randomization schedule. The issues related to randomization are also discussed. Case studies are used to illustrate the use of SAS programming and S...

متن کامل

Providing a practical Model of the Waste Management Master Plan with Emphasis on Public Participation “Using the SWOT method and the QSPM matrix and the FAHP method”

The purpose of this study is to present a practical model of strategic waste management using two SWOT models and hierarchical analysis. In this regard, using the strengths and weaknesses, the present situation and factors affecting the waste management in Tehran have been investigated. In this study, the importance of public participation in waste management using Delphi and FAHP methods was i...

متن کامل

Developing a conceptual model based upon the Latin Hypercube Sampling for integrating OHS into project risk evaluation

Abstract Project management in construction industry, in many cases, is imperfect with respect to the integration of Occupational Health and Safety (OHS) risks. This imperfection exhibits itself as complications affecting the riskiness of industrial procedures and is illustrated usually by poor awareness of OHS within project teams. Difficulties on OHS regularly came about in the construction i...

متن کامل

Reflection on the Research Methodological Skills of Master Students in Human Sciences disciplines: mixed method study

Current study has been implemented with the aim of quality evaluation of research methodological skills of master students in human science disciplines in Tehran's public Universities. In qualitative section, by using purposeful and snow-ball sampling, experts in field of teaching methodology were interviewed. By using content analysis and coding procedure and also the syllabuses of the researc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017