Scheduling Resource-Constrained Projects Competitively at Modest Memory Requirements

نویسنده

  • Arno Sprecher
چکیده

We consider the resource-constrained project scheduling problem. The purpose of this paper is to direct the focus to a branch-and-bound concept that can, by simple adaptations, operate on a wide range of problem settings. The general approach can, e.g., deal with multi-mode problems, resource availability varying with time, and a wide range of objectives. Even the simple assembly line balancing problem of type-1 can be competitively approached with some modi cations. Although the algorithm is the most general and simple one currently available for resource-constrained project scheduling, the computational performance can compete with the best approaches available for the single-mode problem. The algorithm uses far less memory than the state-of-the-art procedure, i.e., 256 KB versus 24 MB, for solving the standard benchmark set with projects consisting of 32 activities within comparable time. If both approaches are allowed to make limited use of memory, i.e. 256 KB, then more than 97% of the benchmark instances can be solved within fractions of the time required by the current state-of-the-art procedure. The truncated version of our algorithm achieves at 256 KB approximately the results of the truncated version of the state-of-the-art approach at 24 MB. Since, in general, the memory requirements exponentially grow with the number of activities the project consists of, memory will become a critical resource, and the strategy to access previously stored information will gain fundamental importance, when solving larger projects.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Splittable stochastic project scheduling with constrained renewable resource

This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...

متن کامل

A New Bi-Objective Model for a Multi-Mode Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and four Payment Models

The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

متن کامل

Constrained Renewable Resource Allocation in Fuzzy Metagraphs via Min-Slack

This paper discusses that the fuzzy metagraphs can be used as a tool for scheduling and control of fuzzy projects. Often, available resources for executing projects may be limited. It is assumed the resources required to accomplish each activity of project (metagraph edges) is renewable. One of the common methods for scheduling projects is using the min-slack. So, first, the forward and bac...

متن کامل

A Genetic Algorithm and a Model for the Resource Constrained Project Scheduling Problem with Multiple Crushable Modes

Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, ...

متن کامل

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1997