Stochastic Resource-constrained Project Scheduling

نویسندگان

  • Frederik Stork
  • Rolf H. Möhring
  • Rolf Möhring
  • Martin Skutella
  • Andreas Schulz
  • Marc Pfetsch
  • Michael Naatz
  • Ekkehard Köhler
چکیده

PREFACE After having received my diploma from the Technische Universität Berlin in 1996, Rolf Möhring, the supervisor of my diploma thesis, offered me a research position in his group. At that time I was employed at a Berlin software company the head of which, Gert Scheschonk, strongly encouraged me to accept the offer. I accepted and in 1997 I began to work within a research initiative funded by the Deutsche Forschungsgemeinschaft DFG. The members engaged in this initiative belong to five research groups in Germany which are located at universities in Bonn, Karlsruhe, Kiel, Osnabrück, and Berlin. In Berlin, the scope of the project was to develop algorithms and theory for stochastic resource-constrained project scheduling problems which is the main topic of this thesis. I am thankful to Rolf Möhring for his support, his encouragement, and the supervision of my thesis. In particular, I greatly benefited from his guidance during my work on AND/OR precedence constraints and scheduling policies. My special thanks go to my colleagues Martin Skutella and Marc Uetz. Martin greatly helped to establish, generalize, and improve many of my original considerations on AND/OR precedence constraints which finally led to the results presented in Chapters 2 and 3. The continuous fruitful discussion with Marc led to new insights in the field of deterministic resource-constrained project scheduling. The results presented in Chapter 4 on different representations of resource constraints are one example of this productive collaboration. I am also very grateful to my colleagues Andreas Schulz and Matthias Müller-Hannemann. I gained a lot from Andreas' expertise and his co-authorship in papers on deterministic project scheduling (which are not part of this thesis). My former roommate Matthias was always willing to interrupt his work in order to discuss the questions I raised. I would also like to mention the fruitful collaboration with the other members of the DFG research initiative on resource-constrained project scheduling. In particular , I thank Peter Brucker for the willingness to serve as a member of my thesis committee. Some parts of this thesis rely on software implementations that would not have reached the current quality without the support of Ewgenij Gawrilow. I thank him for introducing me to the concept of generic programming; he had a great share in establishing the basis of our programming environment, a collection of fundamental scheduling algorithms and data structures. for their careful proofreading of different parts of the manuscript. …

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem

Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...

متن کامل

Splittable stochastic project scheduling with constrained renewable resource

This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...

متن کامل

The preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach

Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

متن کامل

Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)

Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...

متن کامل

A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

متن کامل

A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project

This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2001