Scheduling uncertain orders in the customer-subcontractor context

نویسندگان

  • Laurent Geneste
  • Bernard Grabot
  • Agnès Letouzey
چکیده

Within the customer–subcontractor negotiation process, the first problem of the subcontractor is to provide the customer with a reliable order lead-time although his workload is partially uncertain. Actually, a part of the subcontractor workload is composed of orders under negotiation which can be either confirmed or cancelled. Fuzzy logic and possibility theory have widely been used in scheduling in order to represent the uncertainty or imprecision of processing times, but the existence of the manufacturing orders is not usually set into question. We suggest a method allowing to take into account the uncertainty of subcontracted orders. This method is consistent with list scheduling: as a consequence, it can be used in many classical schedulers. Its implementation in a scheduler prototype called TAPAS is described. In this article, we focus on the performance of validation tests which show the interest of the method.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A chance-constrained multi-objective model for final assembly scheduling in ATO systems with uncertain sub-assembly availability

A chance-constraint multi-objective model under uncertainty in the availability of subassemblies is proposed for scheduling in ATO systems. The on-time delivery of customer orders as well as reducing the company's cost is crucial; therefore, a three-objective model is proposed including the minimization of1) overtime, idletime, change-over, and setup costs, 2) total dispersion of items’ deliver...

متن کامل

Customer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop

This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...

متن کامل

Simultaneous Due Date Assignment and Lot Sizing with Uncertain Flow Times

Due date assignment for customer orders has been studied in various productionenvironments using different modeling approaches. In this paper the researchers consider aproduction system in which the orders of several customers are produced in a single batch because ofthe economy of scale. If a batch is completed before receiving customer orders, inventory carryingcost is incurred but if it is c...

متن کامل

Design of An Integrated Robust Optimization Model for Closed-Loop Supply Chain and supplier and remanufacturing subcontractor selection

The development of optimization and mathematical models for closed loop supply chain (CLSC) design has attracted considerable interest over the past decades. However, the uncertainties that are inherent in the network design are challenging the capabilities of the developed tools. In CLSC Uncertainty in demand is major source of uncertainty. The aim of this paper, therefore, is to present a Rob...

متن کامل

Blackboard Agents for Mixed-Initiative Management of Integrated Process-Planning/Production-Scheduling Solutions Across the Supply Chain

As companies increasingly customize their products, move towards smaller lot production and experiment with more flexible customer/supplier arrangements, they increasingly require the ability to respond quickly, accurately and competitively to customer requests for bids on new products and efficiently work out supplier/subcontractor arrangements for these new products. This in turn requires the...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 147  شماره 

صفحات  -

تاریخ انتشار 2003