Professional Support for Cooperative Simulation Projects – A Challenge for the Simulation of Logistics and Production Networks

نویسندگان

  • Carlos Jahn
  • André Hanisch
چکیده

The globalization, the focusing on core capabilities and the expanding international division of labor lead to an economy that is increasingly shaped by logisticsand production networks. Regarding the simulation of logisticsand production systems (which are frequent objects of discrete simulation) this means that on the one hand the intensified enterprise-spreading processes in networks and their systems and structures have to be illustrated. In the future, on the other hand, simulations will not be accomplished by isolated people but rather by several different partners. Usually these partners are located at different places and different time zones. Until now, at the market available tools were lacking support for supporting such distributed simulation projects. This paper describes a solution for cooperative simulation called Web Based Simulation Center that has been developed through co-operation of the Otto-von-GuerickeUniversity Magdeburg and the Fraunhofer Institute for Factory Operation and Automation IFF Magdeburg. Simulation projects are usually cooperative endeavors that involve not only the work on the simulation model itself but also a lot of communication among project partners. In the past, support for communication and cooperation in simulation projects has been poor to non-existent. The WBSC is designed to bring simulation and cooperation together. Because this approach requires and benefits from making simulation tools available on the Web, it is also a first step toward introducing Application Service Providing (ASP) for simulation.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Assessment of VSM Scenarios by Simulation of Logistics Systems in Petrochemical Company

Believe that VSM involves the concurrent improve of processes, organizations, and their supporting information systems to achieve radical improvement in time, cost, quality, and customer’s regard for the company’s products and services.  Nowadays, simulation is the most important way to do VSM and improving logistics processes. A time study was performed by measuring the time duration per proce...

متن کامل

Performance Analysis of Wireless Cooperative Networks with Iterative Incremental Relay Selection

In this paper, an iterative incremental relay selection (IIRS) scheme is considered for wireless cooperative networks in order to increase the reliability of transmission. Different from the conventional incremental relay selection which incrementally selects a best relay for only one iteration; the IIRS scheme iteratively applies the incremental relaying and relay selection processes. To evalu...

متن کامل

Sum-Rate Maximization Based on Power Constraints for Cooperative AF Relay Networks

In this paper, our objective is maximizing total sum-rate subject to power constraints on total relay transmit power or individual relay powers, for amplify-and-forward single-antenna relay-based wireless communication networks. We derive a closed-form solution for the total power constraint optimization problem and show that the individual relay power constraints optimization problem is a quad...

متن کامل

Project Time and Cost Forecasting using Monte Carlo simulation and Artificial Neural Networks

The aim of this study is to present a new method to predict project time and cost under uncertainty. Assuming that what happens in projects implementation which is expressed in the form of Earned Value Management (EVM) indicators is primarily related to the nature of randomness or unreliability, in this study, by using Monte Carlo simulation, and assuming a specific distribution for the time an...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003