Prioritisation of System Changes using Cost-Benefit and Risk Assessments

نویسندگان

  • Des Greer
  • David W. Bustard
  • T. Sunazuka
چکیده

This paper proposes an approach to the prioritisation of system changes that takes account of the relative costs and benefits of those changes and the risks that they reduce or introduce. This is part of the SERUM methodology (Software Engineering Risk: Understanding and Management), which is being developed to help identify effective ways of using risk analysis and control in software production. SERUM introduces risk management at the initial business analysis stage of requirements investigation, and assumes an evolutionary approach to software delivery. Prioritisation is determined from five factors: benefits, costs and risk exposure in the current system, target system, and development process. The relative importance of these factors is adjustable. Results from a case study at NEC illustrate the prioritisation process and a supporting software tool is also described.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Model for Runway Landing Flow and Capacity with Risk and Cost Benefit Factors

As the demand for the civil aviation has been growing for decades and the system becoming increasingly complex, the use of systems engineering and operations research tools have shown to be of further use in managing this system. In this study, we apply such tools in managing landing operations on runways (as the bottleneck and highly valuable resources of air transportation networks) to handle...

متن کامل

Effecting and Measuring Risk Reduction in Software Development

This paper describes an application of SERUM, a risk management methodology, to the definition and prioritisation of changes in a network management system at NEC Corporation. SERUM makes use of two risk reduction strategies: (i) performing a business analysis as the means of establishing required system changes and (ii) using an evolutionary delivery mechanism as means to implement those chang...

متن کامل

Assessing the cost effectiveness of using prognostic biomarkers with decision models: case study in prioritising patients waiting for coronary artery surgery

OBJECTIVE To determine the effectiveness and cost effectiveness of using information from circulating biomarkers to inform the prioritisation process of patients with stable angina awaiting coronary artery bypass graft surgery. DESIGN Decision analytical model comparing four prioritisation strategies without biomarkers (no formal prioritisation, two urgency scores, and a risk score) and three...

متن کامل

Improving Long Run Marginal Cost based Pricing along with Extended Benefit Factor method for Revenue Reconciliation of Transmission Network in Restructured Power System

Abstract : There are several methods to cover the costs of a transmission system and distribution networks. These methods are divided into either incremental or marginal approaches, which can be either long-term or short-term. The main difference between the incremental and marginal approach is how to calculate the cost of using the network. In the incremental approach, simulation and in the ma...

متن کامل

The effectiveness and cost-effectiveness of biomarkers for the prioritisation of patients awaiting coronary revascularisation: a systematic review and decision model.

OBJECTIVE To determine the effectiveness and cost-effectiveness of a range of strategies based on conventional clinical information and novel circulating biomarkers for prioritising patients with stable angina awaiting coronary artery bypass grafting (CABG). DATA SOURCES MEDLINE and EMBASE were searched from 1966 until 30 November 2008. REVIEW METHODS We carried out systematic reviews and m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1999