Composite Manufacturing Process Selection Using Analytical Hierarchy Process

نویسندگان

  • A. Hambali
  • S. M. Sapuan
  • N. Ismail
  • Y. Nukman
چکیده

This paper describes an approach, based on the analytical hierarchy process (AHP) that assists decision makers or manufacturing engineers determining the most appropriate manufacturing process to be employd in manufacturing of composite automotive bumper beam at the early stage of product development process. There are 5 types of processes under consideration namely injection moulding (IM), resin transfer moulding (RTM), structural reaction injection moulding (SRIM), reaction injection moulding (RIM) and compression moulding (CM). The analysis ranks the 5 types of processes for suitability of use in manufacturing automotive bumper beam based on 6 main selection factors and 12 subfactors. Determining the right manufacturing process was performed based on AHP concept through utilizing Expert Choice software. The results indicated that the injection moulding was the most appropriate manufacturing process because it has the highest value (22.8%) among the other manufacturing processes. The sensitivity analysis was performed to test the stability of the priority ranking and study the effect of different factors on deciding the best decision option. Keyword: Analytical hierarchy process (AHP), manufacturing process selection, conceptual design stage, automotive bumper beam, concurrent engineering

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process

Manufacturing produces real wealth for any country and constitutes the back bone for the service sector. The objective of any organization is to earn profit. Usually the market fixes the selling price of the manufactured components. Unless there is focus on the manufacturing strategy of reducing manufacturing cost, it is very difficult to sustain in this ever competitive world. A suitable manuf...

متن کامل

Industrial landfill site selection using Analytical Hierarchy Process (Case study: Razi industrial town of Isfahan-Iran)

Suitable landfill site selection is a significant step in the integrated management of solid waste. Because of some dangerous industrial waste, landfill site selection is more important. The selection process should be considered different criteria. The purpose of this study was to determine the appropriate location of industrial waste landfill Razi complex by using Analytical Hierarchy Process...

متن کامل

Supplier selection and evaluation method using Analytical Hierarchy Process (AHP): a case study on an apparel manufacturing organisation

Supplier selection, one of the most important issues of a company, must be systematically considered from the decision makers’ perspectives. For this reason, the supplier selection process were evaluated by researchers for many years in a large framework comprised of various experimental and analytical techniques and successful applications were done in various sectors. In this paper, supplier ...

متن کامل

Evolution Site Selection by Using an Analytical Hierarchy Process for Decentralized Wastewater Treatment Plants in the City of Qom, Iran

Introduction: Decentralized wastewater treatment facilities are an expensive approach for developing countries. Decentralized wastewater treatment plants (DWWTPs) are a flexible technology. They have low construction and operational costs. Site selection is the most significant stage in the implementation of a DWWTPS. Therefore, the present study aimed to perform a site selection among the prop...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009