Scheduling Interval Ordered Tasks with Non-Uniform Deadlines

نویسنده

  • Jacques Verriet
چکیده

Garey and Johnson defined an algorithm that finds minimum-lateness schedules for arbitrary graphs with unit-length tasks on two processors. Their algorithm can be easily generalised to an algorithm that constructs minimumlateness schedules for interval orders on m processors. In this paper, we study the problem of scheduling interval orders with deadlines without neglecting the communication costs. An algorithm is presented that finds minimum-lateness schedules. Like the algorithm by Garey and Johnson, it first computes modified deadlines; these are used to assign a starting time to every task. Unlike the algorithm by Garey and Johnson, calculating a modified deadline for every individual task is not sufficient: in order to fully use the knowledge of the precedence constraints and the communication delays, the algorithm has to compute deadlines for pairs of tasks. The algorithm constructs minimum-lateness schedules in O(n2) time.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling interval-ordered tasks with non-uniform deadlines subject to non-zero communication delays

We study the problem of scheduling unit-length interval-ordered tasks subject to unit-length communication delays with the objective of minimising the maximum tardiness. Without communication delays, this problem can be solved by a generalisation of an algorithm presented by Garey and Johnson. In this paper, an algorithm is presented that considers unit-length communication delays and construct...

متن کامل

Scheduling interval orders with release dates and deadlines

We study the problem of scheduling unit-length tasks with release dates and deadlines subject to precedence constraints and unit communication delays. Two polynomial-time algorithms are de ned: one constructs schedules for graphs with uniform release dates, the other for graphs with arbitrary release dates. They have a special structure: unlike most scheduling algorithms, they do not consider i...

متن کامل

Comparing Mixed-Integer and Constraint Programming for the No-Wait Flow Shop Problem with Due Date Constraints

The impetus for this research was examining a flow shop problem in which tasks were expected to be successively carried out with no time interval (i.e., no wait time) between them. For this reason, they should be completed by specific dates or deadlines. In this regard, the efficiency of the models was evaluated based on makespan. To solve the NP-Hard problem, we developed two mathematical mode...

متن کامل

The Schedulability of Deadline - Ordered ServiceDisciplinesNorival

| In a deadline-ordered service discipline, packets are assigned transmission deadlines and are transmitted in increasing order of deadlines. Diierent deadline-ordered service disciplines are distinguished by how they deene deadlines. One of the more diicult analytical problems one faces when designing a new deadline-ordered service discipline is to prove that one can bound the end of transmiss...

متن کامل

An Efficient Non-Preemptive Real-Time Scheduling

Traditional real-time systems are designed using preemptive scheduling and worst-case execution time estimates to guarantee the execution of high priority tasks. There is, however, an interest in exploring non-preemptive scheduling models for real-time systems, particularly for soft real-time multimedia applications. In this paper we propose a new algorithm that uses multiple scheduling strateg...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1996