Improvement of earliness and lateness by postponement on an automotive production line
نویسندگان
چکیده
This article takes an interest in improving the performance of a subproblem of car sequencing: the resequencing problem. It extends a model of assembly line with the simulation of buffer stocks with drawers. Presequencing and resequencing are modeled with different types of stock management policy. Furthermore, postponement is introduced by two points of differentiation within the line. After choosing relevant variables and performance indicators a large-scale design of experiments finally enables to estimate average improvement brought by postponement to more than 39.7%, compared to the situation without postponement.
منابع مشابه
On-Line Algorithms for Due Date Quotation with Lateness Penalties
We present a novel model for due date quotation. Jobs arrive at a single server or m-machine flow shop over time. Upon arrival, the processing times on each machine of the job are known, and due dates must be quoted for each job. The jobs are sequenced on the machines without preemption. Associated with each job, there are three measures of disadvantages to the inventory cost and the service le...
متن کاملThe Importance of Being Early
Abstract This research quantifies the relationship between the cost of earliness and lateness by empirically observing commute trips from two different sources. The first empirical analysis uses individual level travel survey data from six metropolitan regions while the second analysis uses traffic data from the Twin Cities freeway network. The analysis conducted in this research provides a met...
متن کاملA Lean Manufacturing Roadmap for an Automotive Body Assembly Line within Axiomatic Design Framework
In this paper we are to present a practical application of Axiomatic Design (AD) methodology, as a roadmap to lean production, in redesigning a car body assembly line. Axiomatic Design theory provides a framework to simplify the whole problem. According to the AD principles, a hierarchical structure has been developed. The developed structure originated in lean manufacturing principles and exis...
متن کاملSolving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs
Nowadays, by successful application of on time production concept in other concepts like production management and storage, the need to complete the processing of jobs in their delivery time is considered a key issue in industrial environments. Unrelated parallel machines scheduling is a general mood of classic problems of parallel machines. In some of the applications of unrelated parallel mac...
متن کاملA Functional Equation that Arises in Problems of Scheduling with Priorities and Lateness/Earliness Penalties
we consider a functional equation that arises in problems of scheduling with priorities and earliness/lateness penalties. We solve the equation and note how it can be used to analyze the invariance of conclusions about optimality of a schedule if the scale used to measure priority is replaced by another acceptable scale. Keywords-Scheduling, Functional equations, Measurement theory, Penalty fun...