Multiobjective optimization in Linear Repetitive Project scheduling

نویسنده

  • Pandelis G. Ipsilandis
چکیده

The Critical Path Method (CPM) and the Repetitive Scheduling Method (RSM) are the most often used tools for the planning, scheduling and control Linear Repetitive Projects (LRPs). CPM focuses mostly on project’s duration and critical activities, while RSM focuses on resource continuity. In this paper we present a linear programming approach to address the multi objective nature of decisions construction managers face in scheduling LRPs. The Multi Objective Linear Programming model (MOLP-LRP) is a parametric model that can optimize a schedule in terms of duration, work-breaks, unit completion time and respective costs, while at the same time the LP range sensitivity analysis can provide useful information regarding cost tradeoffs between delay, work-break and unit delivery costs. MOLPS-LRP can generate alternative schedules based on the relative magnitude and importance of different cost elements. In this sense it provides managers with the capability to consider alternative schedules besides those defined by minimum duration (CPM) or minimum resource workbreaks (RSM). Demonstrative results and analysis are provided through a well known in the literature case study example.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Repetitive construction processes scheduling using mixed-integer linear programming

Many construction projects contain several identical or similar units, such as floors in multistory buildings, houses in housing developments, sections of pipelines or highways. Repetitive processes arise from the subdivision of a generalized construction process into specific activities associated with particular units. In many cases it is possible to perform individual processes (repeated in ...

متن کامل

Scheduling Repetitive Construction Projects Using Fuzzy Linear Programming

Scheduling problem for repetitive construction projects involves three conflicting objectives. These objectives are project duration, project total cost, and project total interruption time. This paper presents a multi-objective fuzzy linear programming model (FLP) for resolving this problem. Literature concerned with scheduling problems for repetitive construction projects was reviewed. Multi-...

متن کامل

DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY

Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...

متن کامل

A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations

We study resource-constrained project scheduling problems with perturbation on activity durations. With the consideration of robustness and stability of a schedule, we model the problem as a multiobjective optimization problem. Three objectives—makespan minimization, robustness maximization, and stability maximization—are simultaneously considered. We propose a hybrid multiobjective evolutionar...

متن کامل

A multiobjective evolutionary algorithm for scheduling and inspection planning in software development projects

In this article, we consider the problem of planning inspections and other tasks within a software development (SD) project with respect to the objectives quality (no. of defects), project duration, and costs. Based on a discrete-event simulation model of SD processes comprising the phases coding, inspection, test, and rework, we present a simplified formulation of the problem as a multiobjecti...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Operational Research

دوره 6  شماره 

صفحات  -

تاریخ انتشار 2006