Managing a nuclear power plant (NPP) calls for evaluation and trading off the conflicting objectives of safe operation and economic burden. The reduction of NPP risk is strongly correlated to the reduction of NPP safety systems unavailability. The application of the probabilistic safety assessment in order to reduce safety systems unavailability is one of the prime goals in the nuclear safety analyses nowadays. Equipment ageing, on the other side, has gradually become a major concern in the nuclear industry. This paper presents a new approach for time-dependent unavailability modelling of safety equipment. The presented model incorporates the effects of ageing on equipment unavailability assessment as well. The model takes into account the effects of corrective maintenance and preventive maintenance on the calculated time-dependent unavailability. The core damage frequency, assessed with the new model, is selected to be the relevant plant risk measure within the study. The total incurred dose due to performing the test and maintenance activities on the safety equipment from one side and calculated plant risk from another are accounted as two objective functions in the process of genetic algorithm-based multi-objective optimization of the equipment surveillance test interval. The obtained optimal surveillance test intervals show that the risk-informed test and maintenance schedules differ from ones prescribed in the deterministically-defined technical specifications.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multi-Objective Optimization of Testing and Maintenance in Nuclear Power Plants Considering Component Ageing

The study presented herein is aimed towards improvement of nuclear power plant safety by utilizing the probabilistic safety assessment methodology. A new time-dependent unavailability model of ageing safety equipment within the nuclear industry is proposed. Equipment ageing along with effects of corrective maintenance and preventive maintenance are modelled as an integral part of the new time-d...

متن کامل

Development and application of a living probabilistic safety assessment tool: Multi-objective multi-dimensional optimization of surveillance requirements in NPPs considering their ageing

The benefits of utilizing the probabilistic safety assessment towards improvement of nuclear power plant safety are presented in this paper. Namely, a nuclear power plant risk reduction can be achieved by risk-informed optimization of the deterministically-determined surveillance requirements. A living probabilistic safety assessment tool for time-dependent risk analysis on component, system an...

متن کامل

A fuzzy multi-objective linear programming approach for solving a new multi-objective job shop scheduling with sequence-dependent setup times

This paper presents a new mathematical model for a bi-objective job shop scheduling problem with sequence-dependent setup times that minimizes the weighted mean completion time and the weighted mean tardiness time. For solving this multi-objective model, we develop a fuzzy multi-objective linear programming (FMOLP) model. In this problem, a proposed FMOLP method is applied with respect to the o...

متن کامل

A MULTI-OBJECTIVE OPTIMIZATION MODEL FOR PROJECT PORTFOLIO SELECTION CONSIDERING AGGREGATE COMPLEXITY: A CASE STUDY

Existing project selection models do not consider the complexity of projects as a selection criterion, while their complexity may prolong the project duration and even result in its failure. In addition, existing models cannot formulate the aggregate complexity of the selected projects. The aggregated complexity is not always equal to summation of complexity of projects because of possible syne...

متن کامل

Sensitivity study of a new model for assessing time-dependent risk in ageing NPP

The nuclear power plants risk reduction by application of the probabilistic safety assessment is one of the main focuses of the nuclear safety today. The goal is the reduction of the unavailability of the nuclear power plants safety systems. On the other hand, the world NPP fleet is ageing fast. Equipment ageing has gradually become a major concern in the nuclear industry since the number of sa...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012