Modeling of a Probabilistic Re-Entrant Line Bounded by Limited Operation Utilization Time
نویسنده
چکیده
This paper presents an analytical model based on mean value analysis (MVA) technique for a probabilistic re-entrant line. The objective is to develop a solution method to determine the total cycle time of a Reflow Screening (RS) operation in a semiconductor assembly plant. The uniqueness of this operation is that it has to be borrowed from another department in order to perform the production screening task. Since the operation is being shared, there is a time limit to utilize it in a day. Screening of lots that cannot be completed within the given time has to be continued in the following days. The contributions of this paper is the development of a lot clustering method and factoring the limited time sharing condition and thus develop an analytical model. Comparison results were made using available real historical data. The proposed model provided operation managers with the total cycle time computation method and determining the appropriate cluster size to be loaded into the operation.
منابع مشابه
Modeling of a Probabilistic Re-Entrant Line Bounded by Limited Operation Utilization Time
This paper presents an analytical model based on mean value analysis (MVA) technique for a probabilistic re-entrant line. The objective is to develop a solution method to determine the total cycle time of a Reflow Screening (RS) operation in a semiconductor assembly plant. The uniqueness of this operation is that it has to be borrowed from another department in order to perform the production s...
متن کاملA Scheduling Model for the Re-entrant Manufacturing System and Its Optimization by NSGA-II
In this study, a two-objective mixed-integer linear programming model (MILP) for multi-product re-entrant flow shop scheduling problem has been designed. As a result, two objectives are considered. One of them is maximization of the production rate and the other is the minimization of processing time. The system has m stations and can process several products in a moment. The re-entrant flow sho...
متن کاملSolving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm
In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...
متن کاملProductivity Improvement through Line Balancing by Using Simulation Modeling
The typical problems facing garment manufacturers are long production lead time, bottlenecking, and low productivity. The most critical phase of garment manufacturing is the sewing phase, as it generally involves a number of operations or for the simple reason that it’s labor intensive. In assembly line balancing, allocation of jobs to machines is based on the objective of minimizing the workfl...
متن کاملStochastic re-entrant line modeling for an environment stress testing in a semiconductor assembly industry
Environmental stress testing (EST) is a reliability test for the semiconductor products that is concerned with how products perform its intended functions under some environmental conditions. Planning, implementation and delivery schedules are affected by the outcome of these tests and it is crucial to determine the throughput of the EST process. In this paper we present an efficient modified a...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2008