Heuristic Techniques in Project Sequencing

نویسنده

  • Egill B. Hreinsson
چکیده

One of the problems faced by planners when designed an expansion plan for water resources systems is selecting the sequence of projects that satisfies a given demand at minimum cost, some prescribed time into the future. This problem is indeed closely related to what is generally known as the capacity expansion problem although unique local conditions at each project site result in a somewhat different problem formulation. To ensure an optimal solution to the project sequencing problem the usual approach has been to use dynamic programming techniques, although it suffers from the commonly known limits on problem size due to the associated excessive computational requirements. The need of planners in search of a practical screening method useful at all stages in the planning process, involving possibly a large number of projects, has led to the introduction of several heuristic algorithms. While such algorithms do not guarantee an optimal solution, their usefulness is based on the assumption that the solution obtained is close enough to being optimal for some practical purposes. Little has, however, been written about their performance in general. This paper deals with performance evaluation of several such algorithms. The algorithms are tested by creating a number of sequencing problems which are in turn solved by each of them as well as by dynamic programming. By keeping track of each algorithms performance for varying assumptions such as the shape of the demand function and the cost-capacity characteristics for individual projects, a performance profile is established for each algorithm. Such performance measure should be helpful when selecting the appropriate solution procedure to a project-sequencing problem for instance in a practical setting. Presented at NOAK 1980 The 9 Nordic Congress on Operations Research September 18-19, 1980 REYKJAVIK, ICELAND © 1980 Egill B. Hreinsson 2TABLE OF CONTENTS Abstract: ..................................................................... 1

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)

Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...

متن کامل

Project scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study

Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...

متن کامل

A New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value

Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...

متن کامل

A New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value

Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...

متن کامل

A Heuristic Algorithm for Project Scheduling Problem to Maximizing the Net Present Value

This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA). In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have be...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1999