Integrated production and material handling scheduling using mathematical programming and constraint programming

نویسندگان

  • Ghada El Khayat
  • André Langevin
  • Diane Riopel
چکیده

In this article, we optimally solve an integrated production and material handling scheduling problem. Traditionally, scheduling problems consider machines as the only constraining resource. This is however no longer true as material handling equipment are becoming more and more valuable resources requiring important investments. Their operations should be optimized and above all synchronized with machine operations. In the problem, addressed in this paper, a job-shop context is considered. Machines and material handling equipment (AGVs) are considered constraining resources. The shortest path between two machines is used for a material handling operation or an empty travel. A mathematical programming model and a constraint programming model are presented for the problem and solved optimally on test problems from the literature and larger instances that we generated. A commercial software (ILOG OPLStudio) was used for modeling, testing and integrating both models in a decision support system. The performance of the two methods is comparable when using the data from the literature. However, for larger instances the performance of the constraint programming model was superior to the mathematical programming model.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Exact Mixed Integer Programming for Integrated Scheduling and Process Planning in Flexible Environment

This paper presented a mixed integer programming for integrated scheduling and process planning. The presented process plan included some orders with precedence relations similar to Multiple Traveling Salesman Problem (MTSP), which was categorized as an NP-hard problem. These types of problems are also called advanced planning because of simultaneously determining the appropriate sequence and m...

متن کامل

Comparing Mixed-Integer and Constraint Programming for the No-Wait Flow Shop Problem with Due Date Constraints

The impetus for this research was examining a flow shop problem in which tasks were expected to be successively carried out with no time interval (i.e., no wait time) between them. For this reason, they should be completed by specific dates or deadlines. In this regard, the efficiency of the models was evaluated based on makespan. To solve the NP-Hard problem, we developed two mathematical mode...

متن کامل

A Comprehensive Mathematical Model for the Design of a Dynamic Cellular Manufacturing System Integrated with Production Planning and Several Manufacturing Attributes

    Dynamic cellular manufacturing systems,   Mixed-integer non-linear programming,   Production planning, Manufacturing attributes   This paper presents a novel mixed-integer non-linear programming model for the design of a dynamic cellular manufacturing system (DCMS) based on production planning (PP) decisions and several manufacturing attributes. Such an integrated DCMS model with an extensi...

متن کامل

Integral Approaches to Integrated Scheduling

The objective of this chapter is to address integrative views to production scheduling problems. These views are relative to constraining resources integration in the problem formulation, cost components integration to guide optimization and solution methodologies integration to achieve computational performance. We reconsider the widely used models and representations for production scheduling...

متن کامل

A Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production

  In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 175  شماره 

صفحات  -

تاریخ انتشار 2006