An Economic Analysis of the Effect of Delays on Project Costs

نویسنده

  • RAYMOND Y. C. TSE
چکیده

When a delay occurs in a project, there are basically two options: prescribing overtime work and injecting additional resources, in order to meet the project schedule of certain activities. This paper uses economic analysis to demonstrate that a decision maker will select the most suitable alternative by considering productivity losses in overtime work and the relative unit costs between different labor and resource inputs. The paper also suggests some avenues for future empirical research in construction overtime work.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Systems Dynamics Model for Project Management systems of Project-Based Organization

It is obvious that the success of a project-based organization is dependent on its projects. A variety of tools such as the project excellence model, project management maturity models, the earned value method, have been developed in this regard, but there are still delays in projects because the projects have dynamic nature with non-linear relationships and feedback processes during the projec...

متن کامل

Effects of Hadi Project Implementation on the Resilience of Rural Settlements in Oraman, Sarvabad

INTRODUCTION: Resilience is recognized as the potential capacity of a system or community to adapt or resist change in order to maintain an appropriate level of performance and structure. Moreover, governments adopt a variety of strategies to mitigate the effects of natural disasters. In this regard, the rural Hadi project is an efficient method for rural physical management. The present study...

متن کامل

Thermo-economic analysis and optimization of cogeneration systems by considering economic parameters fluctuations

A successful cogeneration system design project needs an estimation of the economical parameters of the project, including capital investment, costs of fuel, expenses in maintenance and operating, and the proper cost for the products. This study describes the economic consideration of the benchmark cogeneration systems, called CGAM system located in the United States. To evaluate the profitabil...

متن کامل

Geothermal Energy for Natural Gas Compressor Stations; an Environmental and Economical Assessment

Iran’s environmental condition is critical, since it is experiencing desertification, unsustainable development and overpopulation. The objective of this study is power source replacement in natural gas stations that operate with natural gas compressors, through using electrical motors, which can be fed by a 160 MW geothermal power plant, as an alternative to gas turbines. Application of such a...

متن کامل

Application of Markov Processes to the Machine Delays Analysis

Production and non-productive equipment and personnel delays are a critical element of any production system. The frequency and length of delays impact heavily on the production and economic efficiency of these systems. Machining processes in wood industry are particularly vulnerable to productive and non-productive delays. Whereas, traditional manufacturing industries usually operate on homoge...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002