An Evaluation of Sequencing Heuristics for Flexible Flowshop Scheduling Problems with Unrelated Parallel Machines and Dual Criteria

نویسندگان

  • Jitti Jungwattanakit
  • Manop Reodecha
  • Paveena Chaovalitwongse
  • Frank Werner
چکیده

This paper deals with the heuristic solution of flexible flowshop scheduling problems with unrelated parallel machines. A setup time is necessary before starting the processing of a job, where the setup time depends on the previous job. No preemption of jobs is allowed. As objective function, this paper considers the minimization of the positively weighted convex sum of makespan and the number of tardy jobs. This paper develops some well-known constructive heuristics for the pure flowshop scheduling problems such as the algorithms given by Palmer (1965), Campbell, Dudek, and Smith (1970), Gupta (1971), and Dannenbring (1977) as well as the insertion heuristic by Nawaz, Enscore and Ham (1983) to the flexible flowshop environment. By using one of these heuristics, the first stage sequence is generated. This sequence will then be used, in conjunction with either FIFO or permutation rules, to construct a schedule for the overall problem. The final solution is then the best schedule obtained by one of the two rules. Furthermore, some iterative heuristics such as a genetic algorithm and a simulated annealing approach are proposed to increase the quality of the constructive solution. Detailed computational results are presented to evaluate the efficiency of the heuristic algorithms. Detailed computational results with the algorithms are presented. © 2005 Elseviser B. V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Flexible flowshop scheduling with equal number of unrelated parallel machines

This article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. The objective is to minimize the makespan for a given set of jobs in the system. This problem class is NP-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. A number of test problems are randomly ge...

متن کامل

A New Lower Bound for Flexible Flow Shop Problem with Unrelated Parallel Machines

Flexible flow shop scheduling problem (FFS) with unrelated parallel machines contains sequencing in flow shop where, at any stage, there exists one or more processors. The objective consists of minimizing the maximum completion time. Because of NP-completeness of FFS problem, it is necessary to use heuristics method to address problems of moderate to large scale problem. Therefore, for assessme...

متن کامل

Solving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm

In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...

متن کامل

Heuristic approach to solve hybrid flow shop scheduling problem with unrelated parallel machines

In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are processed on k machines. A mixed integer linear programming (MILP) model for the HFS scheduling problems with unrelated parallel machines has been proposed to minimize the maximum completion time (makespan). Since the problem is shown to be NP-complete, it is necessary to use heuristic methods to ...

متن کامل

Finite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups

This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005