A problem of finding an acceptable variant in generalized project networks
نویسندگان
چکیده
A project network often has some activities or groups of activities which can be performed at different stages of the project. Then, the problem of finding an optimal/acceptable time or/and optimal/acceptable order of such an activity or a group of activities arises. Such a problem emerges, in particular, in house-building management when the beginnings of some activities may vary in time or/and order. We consider a mathematical formulation of the problem, show its computational complexity, and describe an algorithm for solving the problem.
منابع مشابه
An Algorithm to Obtain Possibly Critical Paths in Imprecise Project Networks
We consider criticality in project networks having imprecise activity duration times. It is well known that finding all possibly critical paths of an imprecise project network is an NP-hard problem. Here, based on a method for finding critical paths of crisp networks by using only the forward recursion of critical path method, for the first time an algorithm is proposed which can find all pos...
متن کاملEnhanced ACS algorithms for plastic analysis of planar frames
In recent years, the trend in solving optimization problems has been directed toward using heuristic algorithms such as neural networks, genetic and ant colony algorithms. The main reason for this trend can be attributed to the fact that these algorithms can be efficiently adjusted to the specific search space to which they are applied and consequently they can be used for many optimization pro...
متن کاملUncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
متن کاملA Problem of Nding an Acceptable Variant in Some Generalized Project Networks
A project network often has some activities or groups of activities which can be performed at diierent stages of the project. Then, the problem of nding an optimal time or/and optimal order of such an activity or a group of activities arises. Such problems emerge, in particular, in house-building management when the beginnings of some activities may vary in time or/and order. We consider a math...
متن کاملDevelopment of a Set of Algorithms for the Multi-Project Scheduling Problems
In this paper, the problem of determining the best schedule for a set of projects has been modeled in the form of a generalized tardiness flowshop (GTF) problem. We develop a set of heuristic algorithms for minimizing the total tardiness of jobs in a GTF problem. In the generalized version of tardiness flowshop problems, a job is considered to be a collection of operations and there is a due da...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- JAMDS
دوره 9 شماره
صفحات -
تاریخ انتشار 2005