The effect of non-linear delay costs on workforce mix

نویسنده

  • D. E. Simmons
چکیده

This paper formulates a simple model to examine the appropriate mix of dedicated and flexible maintenance technicians (servers) required when total delay cost is a non-linear function of mean delay time. The primary decision variable is the number of flexible servers needed to minimize system related costs. Non-linear delay costs appear to significantly increase the level of cross training required compared to previous research using a linear cost function, which showed that a small proportion of flexible servers was sufficient. This has important implications for service system designers in regard to the amount of cross training that might be appropriate. INTRODUCTION An important consideration in the design of a service system is creating a balance between customer demand and service capacity. This paper focuses on a field-based service application, the provision of after-sale service. This type of service, referred to here as field service, has limited capability to balance demand with capacity. A major component of the demand side is the occurrence of random equipment failures, which cannot be leveled to any significant degree. Therefore, firms must achieve a balance by managing capacity. The variability in demand can be eased by either increasing capacity or by increasing the flexibility of available capacity. The main challenge is to meet the random “arrivals” of machine breakdowns in a manner that minimizes delay for the customer while controlling costs for the firm. Firms want to cross-train their servers (field engineers) so that they can respond to the different customer types. Although the cross training of servers increases server flexibility, it also increases service costs, such as out-of-pocket training costs, and the loss of productive time while the field engineers are in training. Initial training may last for up to a year and technology upgrades will necessitate additional training. This paper formulates a simple model to examine the appropriate mix of dedicated and flexible maintenance technicians (servers) required when total delay cost is a non-linear function of mean delay time. The primary decision variable is the number of flexible servers needed to minimize system related costs. Non-linear delay costs appear to significantly increase the level of cross training required compared to previous research using a linear cost function, which showed that a small proportion of flexible servers was sufficient. This has important implications for service system designers in regard to the amount of cross training that might be appropriate. RELEVANT LITERATURE Issues in field service operations have been discussed by Hill [7], [2], and [8], among others. Currently there is little research available covering a field service environment where failures

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Finite Time Mix Synchronization of Delay Fractional-Order Chaotic Systems

Chaos synchronization of coupled fractional order differential equation is receiving increasing attention because of its potential applications in secure communications and control processing. The aim of this paper is synchronization between two identical or different delay fractional-order chaotic systems in finite time. At first, the predictor-corrector method is used to obtain the solutions ...

متن کامل

The intraction effect of ten week combined exercise training (resistance-aerobic) and mix supplemantation (L-carnitine-caffein-arginine) on adiponectin, leptin and lipid profile in obese men

Introduction and purpose: the effect of resistance and aerobic exercise on improving the metabolic conditions of obese people has been confirmed; But the question of whether consuming energy supplements along with exercise improves the metabolic status and blood lipid profile of individuals is a new approach that has been considered. The aim of this investigation was to study the interactive ef...

متن کامل

Investigation of the two-machine flow shop scheduling problem to minimize total energy costs with time-dependent energy prices

In this paper, the problem of two-machine flow shop scheduling to minimize total energy costs under time-of-use tariffs is investigated. As the objective function of this study is not a regular measure, allowing intentional idle-time can be advantageous. So this study considers two approaches, one for non-delay version of the problem and the other one for a situation when inserting intentional ...

متن کامل

Cooperative aggregate production planning: a game theory approach

Production costs in general, and workforce and inventory costs in particular, constitute a large fraction of the operating costs of many manufacturing plants. We introduce cooperative aggregate production planning as a way to decrease these costs. That is, when production planning of two or more facilities (plants) is integrated, they can interchange workforce and products inventory; thus, thei...

متن کامل

A laboratory study on mix design to properly resemble a jointed brittle rock

In this paper attempts have been done to create a mortar with relatively high uniaxial compressive strength (UCS), easy casting, high flexibility, instant hardening, low cost and easy availability. The main use of this material is to physically model the mechanical behavior of jointed rock-like blocks. The effect of four parameters such as joint roughness coefficient (JRC), bridge length (L), b...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • JORS

دوره 64  شماره 

صفحات  -

تاریخ انتشار 2013