Analysis of Strategies for Installing Parallel Stations in Assembly Systems

نویسندگان

  • John W. K. Leung
  • K. K. Lai
چکیده

An assembly system (AS), a valuable tool for mass production, is generally composed of a number of workstations and a transport system. While the workstations perform some preplanned operations, the transport system moves the assemblies by special designed pallets from one station to another. One common problem associated with automatic assembly systems is that some assembly operations may have relatively long cycle times. As a consequence, the productivity, as determined by the operations with the longest cycle time, can be reduced significantly. Therefore, special forms of parallel workstations were developed to improve the performance of an assembly system. In this paper, three most commonly used parallel stations: on-line, off-line and tunnelgated stations in a free transfer assembly system are studied via discrete event simulation. Our findings revealed that the off-line parallel system has the best performance because the two independent parallel stations can lower the buffer requirement; reduce the sensitivity to variability of processing time and balance of a line. On-line parallel systems were found to have a relatively poor performance, because the operations of two parallel stations block each other, and higher buffer capacity is required to achieve similar capacity. The tunnel-gated system was more efficient than the on-line system since the first parallel station can operate independently. More importantly, we have quantified the productivity of the three different strategies mentioned. Engineers can choose the optimal strategies for installing parallel stations under their working environment.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling of Multiple Autonomous Guided Vehicles for an Assembly Line Using Minimum Cost Network Flow

This paper proposed a parallel automated assembly line system to produce multiple products having multiple autonomous guided vehicles (AGVs). Several assembly lines are configured to produce multiple products in which the technologies of machines are shared among the assembly lines when required. The transportation between the stations in an assembly line (intra assembly line) and among station...

متن کامل

Multi-Objective Lead Time Control in Multistage Assembly Systems (TECHNICAL NOTE)

In this paper we develop a multi-objective model to optimally control the lead time of a multistage assembly system. The multistage assembly system is modeled as an open queueing network, whose service stations represent manufacturing or assembly operations. The arrival processes of the individual parts of the product, which should be assembled to each other in assembly stations, are assumed to...

متن کامل

Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage

In this paper, a Job shop scheduling problem with a parallel assembly stage and Lot Streaming (LS) is considered for the first time in both machining and assembly stages. Lot Streaming technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. Hence, to solve job shop scheduling problem with a parallel assembly stage and lot streaming, deci...

متن کامل

A Hybrid Unconscious Search Algorithm for Mixed-model Assembly Line Balancing Problem with SDST, Parallel Workstation and Learning Effect

Due to the variety of products, simultaneous production of different models has an important role in production systems. Moreover, considering the realistic constraints in designing production lines attracted a lot of attentions in recent researches. Since the assembly line balancing problem is NP-hard, efficient methods are needed to solve this kind of problems. In this study, a new hybrid met...

متن کامل

An algorithm for integrated worker assignment, mixed-model two-sided assembly line balancing and bottleneck analysis

This paper addresses a multi-objective mixed-model two-sided assembly line balancing and worker assignment with bottleneck analysis when the task times are dependent on the worker’s skill. This problem is known as NP-hard class, thus, a hybrid cyclic-hierarchical algorithm is presented for solving it. The algorithm is based on Particle Swarm Optimization (PSO) and Theory of Constraints (TOC) an...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005