Solving Dynamic Resource Constraint Project Scheduling Problems Using New Constraint Programming Tools

نویسندگان

  • Abdallah Elkhyari
  • Christelle Guéret
  • Narendra Jussien
چکیده

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Explanation-based repair techniques for solving dynamic scheduling problems

Scheduling problems have been studied a lot over the last decade. Due to the complexity and the variety of such problems, most works consider static problems in which activities are known in advance and constraints are fixed. However, every scheduling problem is subject to unexpected events (consider for example a new activity to schedule, or a machine breakdown). In these cases, a new solution...

متن کامل

Constraint Programming for Dynamic Scheduling Problems

Scheduling problems considered in the literature are often static (activities are known in advance and constraints are fixed). However, every real-life schedule is subject to unexpected events. In these cases, a new solution is needed in a preferably short time and as close as possible to the current solution. In this paper, we present an exact approach for solving dynamic Resource-Constrained ...

متن کامل

The resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study

Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...

متن کامل

Solving Dynamic Rcpsp Using Explanation-based Constraint Programming

The Resource Constrained Project Scheduling Problem (rcpsp) is a general scheduling problem. It consists of a set of activities and a set of renewable resources. Each resource is available in a given constant amount. Each activity has a duration and requires a constant amount of resource to be processed. Preemption is not allowed. Activities are related by two sets of constraints: temporal cons...

متن کامل

Yard crane scheduling in port container terminals using genetic algorithm

Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002