Combining SOM and GA-CBR for Flow Time Prediction in Semiconductor Manufacturing Factory
نویسندگان
چکیده
Flow time of semiconductor manufacturing factory is highly related to the shop floor status; however, the processes are highly complicated and involve more than hundred of production steps. Therefore, a simulation model with the production process of a real wafer fab located in Hsin-Chu Sciencebased Park of Taiwan is built. In this research, a hybrid approach by combining Self-Organizing Map (SOM) and Case-Based Reasoning (CBR) for flow time prediction in semiconductor manufacturing factory is proposed. And Genetic Algorithm (GA) is applied to fine-tune the weights of features in the CBR model. The flow time and related shop floor status are collected and fed into the SOM for classification. Then, corresponding GA-CBR is selected and applied for flow time prediction. Finally, using the simulated data, the effectiveness of the proposed method (SGA-CBR) is shown by comparing with other approaches.
منابع مشابه
Cluster Based Evolving FCBR for Flow Time Prediction in Semiconductor Manufacturing Factory
In this research, a hybrid approach by combining Self-Organizing Map (SOM) and Evolving Fuzzy Case-Based Reasoning (EFCBR) for flow time prediction is proposed. Genetic Algorithms (GAs) is applied to fine-tune the fuzzy term numbers and weights of fuzzy features in the CBR model. The flow time and related shop floor status are collected and fed into the SOM for classification. Then, correspondi...
متن کاملA hybrid system combining self-organizing maps with case-based reasoning in wholesaler's new-release book forecasting
In this paper, we proposed a hybrid system to combine the self-organizing map (SOM) of neural network with case-based reasoning (CBR) method, for sales forecast of new released books. CBR systems have been successfully used in several domains of artificial intelligence. In order to enhance efficiency and capability of CBR systems, we connected the SOM method to deal with cluster problems of CBR...
متن کاملFuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for...
متن کاملComparison of Due-date Oriented Dispatch Rules in Semiconductor Manufacturing
In this study we compare the cycle-time and on-time-delivery performance of the Critical Ratio (CR), the Earliest Due Date (EDD), and the Operation Due Date (ODD) dispatching rules in semiconductor wafer manufacturing. In addition, we comment on the robustness of the rules to low target flow factor values. It turns out that EDD has almost no positive effect on on-time delivery compared to First...
متن کاملA systematic estimation model for fraction nonconforming of a wafer in semiconductor manufacturing research
The clustering phenomenon of defects usually occurs in semiconductor manufacturing. However, previous studies did not pay much attention to the influence of clustering phenomenon for estimating fraction nonconforming of a wafer. Thus, this paper presents a systematic estimation model with considering relevant variables about clustering defects for fraction nonconforming of a wafer. The method c...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2006