How large are software cost overruns? A review of the 1994 CHAOS report
نویسندگان
چکیده
The Standish Group reported in 1994 that the average cost overrun of software projects was as high as 189%. This cost overrun number is used as input in recent governmental reports on software development and as benchmark for several recent projects’ estimation performances. It is therefore important that we can trust this number. More recent cost overrun results reported by the Standish Group and others, however, show much lower cost overrun. Does this mean that software companies have improved their estimation ability strongly the last 10 years? In this paper we argue that there are reasons to doubt the validity of the Standish Group’s 1994 cost overrun results and that a continued use of these results may hinder progress.
منابع مشابه
A Review of Surveys on Software Effort Estimation
This paper summarizes estimation knowledge through a review of surveys on software effort estimation. Main findings were that: (1) Most projects (60-80%) encounter effort and/or schedule overruns. The overruns, however, seem to be lower than the overruns reported by some consultancy companies. For example, Standish Group’s ‘Chaos Report’ describes an average cost overrun of 89%, which is much h...
متن کاملDelays and Cost Overruns in Infrastructure Projects: An Enquiry into Extents, Causes and Remedies
Media reports abound on instances of prolonged delays and excessive cost overruns in infrastructure projects. Only a small number of projects get delivered in time and within the budget. Examples of successful project implementation, like construction of the Delhi Metro Rail, are few and appear only far in between. Indeed, the problem of time and cost overruns in India is widespread and severe....
متن کاملInvestigation of Significant Factors Influencing Time and Cost Overruns in Indian Construction Projects
Time overruns and Cost overruns has been a major issue in many Indian construction projects. The successful execution of construction projects and keeping them within prescribed schedule and cost is very important for effective time performance and cost performance. This research work is carried out on studying significant factors causing Time overruns and Cost overruns in Indian construction p...
متن کاملDevelopment of a Generic Risk Matrix to Manage Project Risks
A generic risk matrix is presented for use identifying and assessing project risks quickly and cost effectively. It assists project managers with few resources to perform project risk analysis. The generic risk matrix (GRM) contains a broad set of risks that are categorized and ranked according to their potential impact and probability of occurrence. The matrix assists PMs in quickly identifyin...
متن کاملSurvey of Overruns in Software Systems Development Cycles
A survey conducted on Norwegian software projects concludes that projects that deploy flexible development models are less likely to suffer from effort overruns than those which deploy sequential development models. However the same can not be said of schedule overruns. This report reviews the paper with further explanation and an evaluation by the author. It concludes that this type of survey ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Information & Software Technology
دوره 48 شماره
صفحات -
تاریخ انتشار 2006