Risk Analysis in the Mining Industry

نویسنده

  • Undram Chinbat
چکیده

People in different societies and different economic, political environments perceive and evaluate risks of large and complex projects in significantly distinctive ways. This chapter demonstrates ways of identifying and analyzing risks in large projects using case studies of mining projects in Mongolia. According to the Project Management Body of Knowledge (PMBOK), composed by the Project Management Institute (PMI), the largest professional organization dedicated to the project management (PM) field, risk management (RM) has been designated as one of the nine main areas (the other eight being integration, scope, time, cost, quality, human resources, communications, and procurement management). Consequently, RM is considered as an important activity of the PM process. The need to identify a project’s uncertainties, estimate their impact, analyze their interactions and control them within a risk-management structure has only in recent years been realized, mainly within the defense, construction and oil industries (Williams, 1995). The chapter explaines risk management processes through a research on mining project risks. For clarity, the chapter will start from explaining about mining projects, providing a simple process flow chart. The next step was to identify risks based on this flow chart and seen in the mining projects implemented in Mongolia. The long-list of the risks may occur during mining project implementation was completed through literature review and discussion with mining engineers and project managers with experience working in Mongolia. Construction project risk and oil and petroleum project risk studies were widely used. The list of identified risks was short-listed by the criteria, which has the most impact to mining project failure during an implementation process in the country. The short-listed risks were assessed and prioritized based on a questionnaire response from the expertise working in the Mongolian mining industry. Finally, a study on project risk information database, methods to create and use the database were formulated.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Applying a decision support system for accident analysis by using data mining approach: A case study on one of the Iranian manufactures

Uncertain and stochastic states have been always taken into consideration in the fields of risk management and accident, like other fields of industrial engineering, and have made decision making difficult and complicated for managers in corrective action selection and control measure approach. In this research, huge data sets of the accidents of a manufacturing and industrial unit have been st...

متن کامل

Modeling and Environmental Risk Assessment of Eastern Alborz Coal Washing Plant

Mining operations and mineral-related industries are closely and directly related with the environment. The negative impacts of mining industry on the environment, known as environmental risks, must be controlled and managed in a way to minimize harmful and destructive effects. Environmental risk assessment studies are a suitable step to identify, analyze and rank the risk factors. In this stud...

متن کامل

Bioassessment of Heavy Metals in Wheat Crop from Soil and Dust in a Coal Mining Area

Coal mining and related industry can increase heavy metals (HMs) concentrations in soil, atmosphere and wheat, thereby posing metal-associated human health risk via food ingestion.  In this study, 58 samples of soil, wheat, and dust were collected from Xuzhou coal mine eastern China, six kinds of HMs Pb, Cd, Cu, Zn, As and Cr were studied for their spatial distribution in wheat, enrichment in d...

متن کامل

Bioassessment of Heavy Metals in Wheat Crop from Soil and Dust in a Coal Mining Area

Coal mining and related industry can increase heavy metals (HMs) concentrations in soil, atmosphere and wheat, thereby posing metal-associated human health risk via food ingestion.  In this study, 58 samples of soil, wheat, and dust were collected from Xuzhou coal mine eastern China, six kinds of HMs Pb, Cd, Cu, Zn, As and Cr were studied for their spatial distribution in wheat, enrichment in d...

متن کامل

Assessment of the Risk of Individual and Occupational Factors Affecting the Causes of Occupational Accidents in the Construction Industry Using the Fuzzy Hierarchical Analysis Approach: A Case Study in Kurdistan Province, Iran

Background and Aim: Based on the Iranian Social Security Organization statistics, in 2012 the accidents occurring in the construction industry accounted for 26% of all the occupational accidents in the country. Therefore, this study was conducted to identify the individual and occupational risk factors affecting the causes of occupational accidents in this industry using the fuzzy hierarchical ...

متن کامل

Multivariate geostatistical analysis: an application to ore body evaluation

It is now common in the mining industry to deal with several correlated attributes, which need to be jointly simulated in order to reproduce their correlations and assess the multivariate grade risk reasonably. Approaches to multivariate simulation which remove the correlation between attributes of interest prior to simulate and then re-impose the relationship afterward have been gaining popula...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012