Design and Implementation of an Effective Decision Support System: A Case Study in Steel Hot Rolling Mill Scheduling

نویسنده

  • Peter Cowling
چکیده

The work described here was largely performed at a medium-sized European steel mill, with an unusually diverse product portfolio, and hence a difficult scheduling problem to solve. The decision support system developed as a result has been successfully used, with minor modifications, at many steel mills worldwide. The work was carried out while the author was employed at A. I. Systems, Belgium, a software house building software for planning and scheduling decision support. A steel hot rolling mill transforms steel slabs into steel coils. First, slabs must be moved from a storage area to the furnace area using manual or semi-automatic cranes. After heating, the slabs are subjected to very high pressures in a series of rolls to produce a steel coil of a few millimetres thickness. The rolls which are in contact with the hot steel band quickly become worn, so coils are milled in programmes of a few hours. Between programmes some or all rolls must be replaced. Several different types of programmes may be chosen, where the programme type chosen determines the types of coil which may be rolled in the programme and the preparation which must be carried out prior to executing the programme. The correct choice of programme type is an important planning decision. A rolling schedule is a sequence of 100 to 300 coils to be milled in a programme lasting several hours, which satisfies complex technical, commercial and logistical constraints. Producing such a rolling schedule is a difficult task, which is carried out by a small group of experienced schedulers. A schematic diagram of the production processes surrounding steel hot rolling is given in Figure 11.1.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A flexible decision support system for steel hot rolling mill scheduling

A steel hot rolling mill subjects steel slabs to high temperatures and pressures in order to form steel coils. We describe the scheduling problem for a steel hot rolling mill. We detail the operation of a commercial decision support system which provides semi-automatic schedules, comparing its operation with existing, manual planning procedures. This commercial system is currently in use in sev...

متن کامل

A Model to Minimize the Hot Rolling Time of a Steel Slab Considering the Steel's Chemical Composition

This paper presents an optimization approach to deal with the problem of minimizing the hot rolling time of a steel slab. Unlike traditional approaches, this work also considers the chemical composition of the steel slab as a parameter, allowing the automatic setup for different steels of the hot rolling mill. To validate the approach discussed here, a six-stand rolling mill is modeled as an op...

متن کامل

Investigations into the Effect of Tension Between the Stands of the Finishing Mill on Width Control in a Hot Rolling Process

This paper is concerned with investigations into the effect of tension between the stands of the finishing mill on width control in a hot rolling process. An analysis is given to predict satisfactorily the variation in width due to spreading and also due to strip tension between the stands. Wusatowski's model which is developed to give an account of spreading is specified and a similar model to...

متن کامل

Investigations into the Effect of Tension Between the Stands of the Finishing Mill on Width Control in a Hot Rolling Process

This paper is concerned with investigations into the effect of tension between the stands of the finishing mill on width control in a hot rolling process. An analysis is given to predict satisfactorily the variation in width due to spreading and also due to strip tension between the stands. Wusatowskis model which is developed to give an account of spreading is specified and a similar model to ...

متن کامل

An application of principal component analysis and logistic regression to facilitate production scheduling decision support system: an automotive industry case

Production planning and control (PPC) systems have to deal with rising complexity and dynamics. The complexity of planning tasks is due to some existing multiple variables and dynamic factors derived from uncertainties surrounding the PPC. Although literatures on exact scheduling algorithms, simulation approaches, and heuristic methods are extensive in production planning, they seem to be ineff...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009